We reserve the right of changing these instructions without special prior notification
TMS-UT-0709-Z07-5
1
1. Introduction
Thank you for the confidence you have shown to us
by having purchased our boiler for central heating and
sanitary water preparation.
For correct and safe and above all economic use
of the product, before assembly and connection,
read thoroughly these instructions.
Packing contains the following elements: boiler (1),
suspension support (3), user’s instructions and letter
of guarantee (3), valve for filling and emptying (4),
impurities collector (5), plastic pipe for venting the
system.
The Termo-Kombi boilers meet any and all national
regulations and legal standards. Pursuant to the
mentioned before, the certification of the product was
done according to the valid EN and HRN standards.
You can take insight into the certificates at the point of
sale, authorized service or web sites:
http:/www.termostroj.com.
The firm Termostroj is certified by the quality system
pursuant with the standard ISO 9001:2000.
Illustration of unpacked product
2. About the product
TERMO
-Kombi is the economic boiler for central
heating and sanitary water preparation that may be
used as the independent source of heat.
The boiler is operated on the principle of rapid heating
smaller water quantities and its energy exploitation is
almost 100%
TERMO
-Kombi is suitable for using in smaller
business premises, flats, smaller catering objects etc.,
where it is important that it takes up small space.
Temperature range of operation is for sanitary water
from 30
o
C up to 55
o
C, for central heating from 30
o
C
up to 90
o
C.
Because of its design and noise free operation, the
TERMO
-Kombi may easily fit in the living space. The
outer metal sheet is protected by powder coating.
2.1. Construction
The electric boiler TERMO
-Kombi is made of quality
boiler metal sheet. The boiler itself is upon welding
sandblasted and protected with quality reactive
fundamental color.
At the bottom side of the boiler there are built in
electric heaters. From the upper side there is the blind
tube for placing the sounding tube of capillary
thermostat, temperature, pressure and thermal fuse
indicator. The boiler is insulated with 19 mm self-
extinguishing
insulating material, which is sufficient to
direct all the heat only to the heating and sanitary
water preparation system.