background image

581-438 8’ Modern Bipod 4 Seat

 

GENERAL FOOTING RECOMMENDATIONS 

 
Diameter and depth of footings illustrated are satisfactory in most applications for pipe 
sizes up to 2 3/8” diameter.  Varying soil & climatic conditions may require deeper and 
heavier footings in some areas.  Check local building codes. 
 
Diagram: 

       Diagram: 

Permanent 

Installation 

     Suggested 

Bracing 

Method 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 

 

 

IF RESILIENT SURFACING IS TO BE LESS THAN 12”, THEN ADDITIONAL PIPE SHOULD BE PUT IN 
CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT. 

 

USE AREA & FOOTING LAYOUT:

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 

 

 

Summary of Contents for 581-438

Page 1: ...ibly create dangerous situations leading to unnecessary accidents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 7908 PACKING LIST HARDWARE BAG 1 CTN 1 Hardware Bag 8 585 520 2 3 8 Swing Ha...

Page 2: ...up to 2 3 8 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Diagram Diagram Permanent Installation Suggested Bracing Method IF RESILIENT SURFACING IS TO BE LESS THAN 12 THEN ADDITIONAL PIPE SHOULD BE PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT USE AREA FOOTING LAYOUT ...

Page 3: ...eck MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S Hooks and or Swing Hangers check the bearing surfaces for wear Replace any parts that show a reduction of 25 from the original size ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and or peened to eliminate sharp edges No mo...

Page 4: ...intended level of resilient surfacing and top rail is at desired height STEP 6 Plumb and level entire unit Tighten set screws by using short length of pipe on end of socket key to add leverage Pour concrete Crown surface Wait 48 hours before removing braces and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the pendulums to the swing hangers Do not over tighten bolt ...

Reviews: