background image

Installation and Operating Guide  

 

High- 

IonBar™ (Ionizing Bar) 

© 

Copyright 2016 Terra Universal Inc. All rights reserved. 

• Revised November 2016 • Document No. 1800-45 

Terra Universal, Inc.  •  TerraUniversal.com  •  800 S. Raymond Ave.  •  Fullerton, CA  92831  •  TEL: (714) 578-6000  •  FAX: (714) 578-6020 

 

 

 

IonBar™ Specifications Table 

Environmental Conditions 

Use (Indoor/Outdoor) 

Indoor Use Only 

Altitude 

Up to 2,000 m 

Operating Temperature 

5°C to 40°C 

Maximum Room Relative Humidity 

80% @ 31°C (50% @ 40°C) 

Allowable Voltage Fluctuation 

±10% 

Equipment Ratings 

Voltage Rating 

120/220VAC 

Frequency Rating 

50/60Hz 

Power Rating 

1A 

List of Input Connections 

Telephone cable connector (low voltage) 

List of Output Connections 

Telephone cable connector (wall transformer) 

Equipment Installation 

Assembly 

See Section 2: Installation (Page 3) 

Protective Earthing (Grounding) 

N/A 

Utility Requirements 

None 

Equipment Operation 

Operating Controls 

None 

Disconnect Device 

Wall transformer; see warning on Page 5 

Accessory Connections 

None 

Specification of limits for intermittent operation 

None 

Safety Symbols 

N/A 

Service and Maintenance 

User serviceable; see Section 3: Maintenance (Page 5) 

Replacement Parts 

See Section 4: Specifications (Page 5) 

Cleaning/Decontamination 

See Section 3: Maintenance (Page 5) 

Poisonous/Hazardous Gas 

N/A; no hazardous gases 

Flammable Liquids 

N/A; no flammable liquids 

 

 

Summary of Contents for IonBar

Page 1: ...ide Document No 1800 45 IonBar Ionizing Bar Copyright 2016 Terra Universal Inc All rights reserved Revised November 2016 Terra Universal Inc TerraUniversal com 800 S Raymond Ave Fullerton CA 92831 TEL 714 578 6000 FAX 714 578 6020 ...

Page 2: ...ods Preinstalled IonBars can also be purchased individually and installed by the user in the desired application An installation kit with standard FFU mounting brackets is sold separately and includes the power supply transformer NOTE For installation in a hood the overall hood width should be at least 2 greater than the length of the desired IonBar Proprietary Notice This manual pertains to propr...

Page 3: ...e mounting brackets installed place the IonBar in the ceiling bay where the fan filter unit goes The mounting brackets will rest upon the frame of the ceiling bay no other fasteners are required Simply lower the FFU into the ceiling bay and allow the weight of the FFU to hold the IonBar in position Installation on Gloveboxes When ordered with a glovebox the IonBar will be mounted to a stainless st...

Page 4: ...r transformer If the IonBar is ordered with the Installation Kit the power transformer power cable and appropriate mounting clips will be included 1 Use a telephone type connector and low voltage cable to connect the IonBar to the power transformer 2 Connect the transformer to the appropriate power supply 120VAC or 240VAC NOTE A single transformer provides ample power for up to 20 emitter pairs De...

Page 5: ...emove deposits from the emitter points 3 If deposits cannot be removed or if the tips appear worn or bent the IonBar may not discharge surfaces with optimal efficiency In this case replace the tips Use a pencil eraser or needle nosed pliers to remove the old tip Insert the new tip and gently press until it seats against the connector no twisting is necessary 4 0 Specifications Replacement Parts Pr...

Page 6: ...0Hz Power Rating 1A List of Input Connections Telephone cable connector low voltage List of Output Connections Telephone cable connector wall transformer Equipment Installation Assembly See Section 2 Installation Page 3 Protective Earthing Grounding N A Utility Requirements None Equipment Operation Operating Controls None Disconnect Device Wall transformer see warning on Page 5 Accessory Connectio...

Page 7: ...separately For Terra s Policy and Procedures for Returning Goods see Terra s Internet site www TerraUniversal com Generally customers can improve the chance of collecting on a freight claim by following these procedures 1 formally requesting that the carrier inspect the shipment immediately upon suspecting damage or shortage to verify condition 2 notifying the carrier upon discovery of concealed d...

Reviews:

Related manuals for IonBar