Operation Procedure
Using the Fast Clamp Attachment (for EBS)
1.
While holding the lid of the Fast Clamp, pull up the lever
until you hear a click. (Figure 1-52)
The plunger is set at the open position.
To close the plunger manually, use [Clamp] button on the Fast clamp screen.
(Refer to page 57.)
• After pulling up the lever, the lever has returned to the original position.
• If the lever does not return to the original position, pull down the lever. If it does
not return to the original position, a failure may have occurred.
Stop using the system immediately, and contact Terumo’s service representative.
2.
Release the latch of the Fast Clamp lid, and open the lid.
(Figure 1-53)
Figure 1-52
3.
Move the Fast Clamp as necessary and insert the tube into
the groove. (Figure 1-54)
Figure 1-53
• When inserting the tube, avoid excessive bending which may degrade the flow.
Figure 1-54
52
Note
Check
Note
Fast
Clamp
Lever
Latch
Lid
Tube
Groove
Summary of Contents for CAPIOX EBS Circuit with X coating
Page 1: ...CAPIOX Emergency Bypass System Instructions for use...
Page 4: ...CAPIOX EBS Circuit with X coating Instructions for use...
Page 8: ...Structure Structure...
Page 25: ...EBS and X coating are trademarks of TERUMO CORPORATION 2019 XX...
Page 26: ...CAPIOX EBS Cannula Kit with X coating Instructions for use...
Page 29: ...CAPIOX Centrifugal Pump Controller SP 200 Instructions for use...
Page 175: ...Memo 146...
Page 176: ...147 Memo...