11
Figure 3-3 Connection method of terminal block for NEOLINE 3000(XL)
Caution: Do not connect the loads with terminal block by the personal without qualified training.
3.3.2 Operation Procedure of External Battery for Long Backup Time UPS
The battery connection procedure is very important. Any incompliance may result in the risk of
electric shock. Therefore, the following steps must be strictly complied with.
1. First connect in series the batteries of the pack to ensure proper battery voltage.
(
Refer to Table 3-3
)
2. Take out the battery cable delivered with the UPS, one end of the external battery cable is a
plug for connecting the UPS, the other end has 3 open wires for connecting the battery pack.
3. Connect the external battery cable to the battery terminal (DO NOT connect the battery socket
of the UPS first. Otherwise, it may cause electric shock). Connect the red wire to the: “+”
terminal of the battery. The black wire is connected to the “-” terminal of the battery. The
green/yellow wire is grounded for protection purpose.
Summary of Contents for NEOLINE 1000
Page 1: ...1 NEOLINE SERIES 1000 2000 3000 1000XL 2000XL 3000XL 1 Phase In 1 Phase Out USER MANUAL...
Page 2: ...2...
Page 5: ...1...
Page 25: ...21 5 Maintenance 5 1 Battery Maintenance...
Page 32: ...28 AGKK10440 12 2012...