Preparing for first-time use
60 Testboy
®
TV 470
Equivalent leakage current measurement (I-EA)
Illustration 8
The DUT is connected to the test socket and has to be switched on.
A low protection voltage is put between the PE conductor and the active
lines (phase and neutral) of the test sockets.
The test leads are only needed in the following cases:
|
With
protection class-I devices
: To test exposed conductive compo-
nents that are not connected to the PE conductor.
|
With
protection class-II devices
: To test all exposed conductive com-
ponents.
Summary of Contents for TV 470
Page 1: ...TV 470 Version 1 1...
Page 17: ...Inbetriebnahme Testboy TV 470 17 DEUTSCH Bild 1 Bild 2...
Page 20: ...Inbetriebnahme 20 Testboy TV 470 Bild 5 Bild 6...
Page 55: ...Preparing for first time use Testboy TV 470 55 ENGLISH Illustration 1 Illustration 2...
Page 58: ...Preparing for first time use 58 Testboy TV 470 Illustration 5 Illustration 6...
Page 93: ...Ingebruikneming Testboy TV 470 93 NEDERLANDS Afb 1 Afb 2...
Page 96: ...Ingebruikneming 96 Testboy TV 470 Afb 5 Afb 6...
Page 131: ...Prepara o para a primeira utiliza o Testboy TV 470 131 PORTUGU S Figura 1 Figura 2...
Page 134: ...Prepara o para a primeira utiliza o 134 Testboy TV 470 Figura 5 Figura 6...
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......