Chapter 9 – Maintenance
TestEquity 101H Temperature/Humidity Chamber
Page 71
Chapter 9 – Maintenance
Preventive Maintenance Schedule
Daily or As Needed
•
Clean chamber interior and exterior.
•
Listen for abnormal noise or vibration.
Every 2 Months or As Needed
•
Drain the Humidity Reservoir.
Every 3 Months or as Needed
•
Inspect or replace the water recirculation filter cartridge.
Every 6 Months
•
Inspect the door seal.
•
Clean the condenser.
Every 12 Months
•
Inspect the electrical/refrigeration compartment.
•
Verify the chamber performance.
•
Verify the calibration.