7.3 ELECTRICAL CONNECTIONS:
▪
Wind Turbine has 3 phase AC
(Shown in RED)
connection. These connections are to be connected
with TESUP charge Controller.
▪
The output of the charge controller can be then connected in two ways:
o
The Output of the charge controller can be connected to the battery.
o
The Output of the charge controller can be connected to the power grid using the
inverter.
▪
The cables from charge controller to the battery or the power grid will be DC
(Shown in Blue)
connection.
▪
Cable Lengths and cross sections should be as follows:
Length
<11 m
<18 m
<29 m
<44 m
<68 m
<110 m
Cross-section 2.5 sq. mm 4 sq. mm
6 sq. mm
10 sq. mm 16 sq. mm 25 sq. mm
CABLE DETAILS
WARNING:
All work on electrical equipment must be carried out by a qualified
electrician with the power switched off!
NOTE:
To ensure proper operation, you must use an original TESUP charge
controller
.
Summary of Contents for ATLAS2.0
Page 2: ...ATLAS 2 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ATLAS 2 0 ...
Page 12: ...ATLAS 2 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...ATLAS 2 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING DIMENSIONS IN mm inches ...
Page 15: ...ATLAS 2 0 MADE IN EUROPE 15 TESUP 5 2 WIRING DIAGRAM WIRING DIAGRAM ...
Page 28: ...ATLAS 2 0 MADE IN EUROPE 28 TESUP 12 DECLARATION ...