ATLAS 2.0 (MADE IN EUROPE)
~ 23 ~
TESUP
8.1 SWITCHING ON THE WIND TURBINE SYSTEM:
▪
Unlock the emergency stop button or release the brake button on the TESUP
charge controller.
▪
The brake is released.
▪
The fast-blinking red LED on the TESUP charge controller goes out.
▪
The wind turbine system supplies power.
8.2 RESTART AFTER EMERGENCY:
▪
Make sure the risk has been removed.
▪
Switch on the wind turbine system (section 8.1)
8.
REGULAR OPERATION
NOTE: For i
nformation on operating the charge controller, refer to the separate
instructions.
Summary of Contents for ATLAS2.0
Page 2: ...ATLAS 2 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ATLAS 2 0 ...
Page 12: ...ATLAS 2 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...ATLAS 2 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING DIMENSIONS IN mm inches ...
Page 15: ...ATLAS 2 0 MADE IN EUROPE 15 TESUP 5 2 WIRING DIAGRAM WIRING DIAGRAM ...
Page 28: ...ATLAS 2 0 MADE IN EUROPE 28 TESUP 12 DECLARATION ...