Carefully open the packaging.
Check the shipment for completeness (refer to the shipping documents).
Separate the packaging material and dispose of it in an environmentally
responsible way.
Danger due to rotor imbalance!
Always replace the complete set of rotor blades.
Risk of injury in case of assembly at windy sites!
Choose an assembly site which is sheltered from the wind.
The assembly process requires calm weather conditions.
Fig. 6:
Assembling the wind turbine
7
.3
Unpacking the components
7
.4
Assembling the wind turbine
WARNING!
5
1
4
2
3
6
3
For installation, select sheltered place.
Hold propeller blade (1) with flat side to hub (2).
Fasten with a M8x45 bolt, nut and one.
Screw on further M8x45 screws and tighten by hand.
Attach boom rod (3) with M8x60 bolt to alternator housing.
Screw nose (4) to hub with M8x75 screw.
Screw wind vane (5) to boom with M8x60 bolt.
Plug - in pin 37 mm as mast connection
12
Summary of Contents for i-1500
Page 1: ... Keep handy at the place of use Wind turbine system i 1500 i 2000 USER MANUAL ...
Page 21: ...Fig 9 Declaration of conformity 13 Declaration of conformity 20 ...
Page 23: ...15 Notes 22 ...
Page 24: ...23 ...
Page 25: ...24 ...