Preparing to use the system
Feed the three-wire cable through the tower right up to the top.
Provide suitable strain relief.
Connect the wires to the generator.
Fig. 8:
Connecting the three-wire cable to the generato
Pull heat shrink tubing over the solder joint and shrink.
Wrap each wire with textile insulating tape.
Danger due to unsuitable tower constructions!
Only use tested mast constructions or original
TESUP
masts .
7
.6
Erecting the wind turbine
WARNING!
Pull a suitable shrink tube over each wire of the cable.
Twist and solder each wire of the cable to the wire from the generator
Short circuit all 3 phases to activate the generator brake
.
1
1
When using the
TESUP
charge controller, press the brake button
Choose a mast diameter <70 mm, so that the rotor blades are
not pressed against the mast during a storm.
Attach the wind turbine to the tower. Be careful not to damage the cable.
Screw wind generator to mast.
Erect the mast.
Align the mast vertically in all directions.
Brace the vertical mast (see Fig. 5)
Kurzschluss aufheben.
14
Summary of Contents for i-1500
Page 1: ... Keep handy at the place of use Wind turbine system i 1500 i 2000 USER MANUAL ...
Page 21: ...Fig 9 Declaration of conformity 13 Declaration of conformity 20 ...
Page 23: ...15 Notes 22 ...
Page 24: ...23 ...
Page 25: ...24 ...