ZEUS 3.0 (MADE IN EUROPE)
~ 15 ~
TESUP
5.2 WIRING DIAGRAM:
WIRING DIAGRAM
Main components and their functions
No. Component
Function
1
Wind turbine
Converts wind energy into electrical energy
2
Switch AC Emergency
Stop Button
Emergency shutdown. When pressed, the wind turbine must be
short-circuited.
3
Charge controller
Generates electrical voltage (24 / 48 VDC Optionally). The TESUP
charge controller.
4
Battery
Stores electrical energy (Acid, Gel)
5
Solar panels
Convert solar energy into electrical energy
6
To converter
Converts 24/48 VDC into 110/220 VAC
Summary of Contents for ZEUS3.0
Page 2: ...ZEUS 3 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ZEUS 3 0 ...
Page 12: ...ZEUS 3 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...ZEUS 3 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING 31 5 cm 193 0 cm 108 cm ...
Page 21: ...ZEUS 3 0 MADE IN EUROPE 21 TESUP ASSEMBLY PROCEDURE ...
Page 30: ...ZEUS 3 0 MADE IN EUROPE 30 TESUP 13 DECLARATION ...