ZEUS 3.0 (MADE IN EUROPE)
~ 25 ~
TESUP
9.1 EMERGENCY SHUTDOWN:
▪
Switch on the brake.
▪
The wind turbine is short-circuited via the TESUP charge controller.
9.2 TEMPORARY SHUTDOWN:
▪
Switch on the brake.
▪
The wind turbine is short-circuited via the TESUP charge controller.
▪
This type of shutdown can occur during the stormy weather when the wind speed is
higher than 27 m/s.
9.3 PROLONGED SHUTDOWN:
▪
Switch on the brake.
▪
The wind turbine is short-circuited via the TESUP charge controller.
9.
SHUTTING DOWN THE WIND TURBINE
Summary of Contents for ZEUS3.0
Page 2: ...ZEUS 3 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ZEUS 3 0 ...
Page 12: ...ZEUS 3 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...ZEUS 3 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING 31 5 cm 193 0 cm 108 cm ...
Page 21: ...ZEUS 3 0 MADE IN EUROPE 21 TESUP ASSEMBLY PROCEDURE ...
Page 30: ...ZEUS 3 0 MADE IN EUROPE 30 TESUP 13 DECLARATION ...