ZEUS 3.0 (MADE IN EUROPE)
~ 4 ~
TESUP
8.2
Restart after an emergency
24
9
Shutting down the System
25
9.1
Emergency Shutdown
25
9.2
Temporary shut-down
25
9.3
Prolonged shut-down
25
10
Maintenance
26
10.1
Safety precautions during maintenance work
26
10.2
Inspection and maintenance schedule
26
10.3
Maintenance and cleaning by the user
27
11
Troubleshooting and diagnostics
28
12
Removal from service and disposal
29
12.1
Final decommissioning of the wind turbine system
29
12.2
Disposal of the wind turbine system and components
29
13
Declaration of Conformity
30
14
Appendix
31
15
Manufacturer Details & Customer Support
32
16
Notes
33
Summary of Contents for ZEUS3.0
Page 2: ...ZEUS 3 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ZEUS 3 0 ...
Page 12: ...ZEUS 3 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...ZEUS 3 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING 31 5 cm 193 0 cm 108 cm ...
Page 21: ...ZEUS 3 0 MADE IN EUROPE 21 TESUP ASSEMBLY PROCEDURE ...
Page 30: ...ZEUS 3 0 MADE IN EUROPE 30 TESUP 13 DECLARATION ...