Test and Measurment Summary
The quiescent current during main boost operation, which is basically the current from the battery to the
IC, is measured at the VSTOR pin. If a source-meter is not available to make the measruement, connect a
100-k
Ω
resistor to VSTOR and connect a 3-V supply from the other end of this resistor to the ground of
the EVM. A 10-M
Ω
meter can be used to measure the voltage drop across the resistor and calculate the
current. No other connections should be made to the EVM and the measurement should be taken after
steady state conditions are reached (may take a few minutes). The reading should be much less than 100
nA.
16
User's Guide for bq25570 Battery Charger Evaluation Module for Energy
SLUUAA7A – July 2013 – Revised August 2014
Harvesting
Copyright © 2013–2014, Texas Instruments Incorporated