Mar-07-2016 DI-50AN6 320 DS (NZ303)_UL_March 2016
Texmate, Inc. Tel. (760) 598-9899 • www.texmate.com
Page 33
Step 1
Step 2
Step 3
Press
at same
time
Press
at same
time
Step 4
Step 5
Press
1
Press
1
Press
1
CONFIGURE
LEVEL 1
SETPOINT & RELAY
FUNCTIONS
Step 9
Step 10
OR
Operational Display
Operational
Display
Press
1
From Step 5
To Step 6
Example
Example
Example
OR
Press
at same
time
Press
at same
time
OR
Step 6
Step 7
Step 8
Exit
SPC_2.
Return to
Operational Display
Adjust setpoint 1 (SP1)
activation value to e.g.
500 counts
Reset 2nd digit to 0. If the 2nd
digit is not reset to 0, the
meter will constantly cycle
thru SPC_1
Save SP1
control settings
Save SP1 activation
value setting
Select [CH1] as the SP1
activation source. See
diagram on Pages 34
and 35
Enter SP1
source sub-menu
Save SP1
control settings
LEVEL 1 SETPOINT CONFIGURATION
Set SPC–1 to [013]:
1st Digit = 0 Energize above SP1 value
or 1 to energize below SP1 value.
2nd Digit = 1 Select source for SP1
3rd Digit = 3 Relay latching with manual reset
Enter
Setpoint
Programming
Mode
OR
Setpoint Programming Mode – Programming Procedures
Example Procedure:
The following procedure describes how to program setpoint
1 (SP1) for the following
Level 1
setpoint and relay functions:
• SP1 to activate from Channel 1 (CH1).
• Relay to energize above or below SP1 value.
• Relay to latch with manual relay reset.
Programming tip
All required setpoint activation values (SP1 to SP6) can be adjusted before
programming setpoint and relay control function settings. See
Setpoint
Programming Mode Logic Diagram
on Page 34.
START HERE
Setpoint Programming Mode continued
See
Setpoints and Relays Supplement (NZ201)
for proce-
dures to program all setpoint and relay operational levels
(Level 1 to Level 3).