FIG 3: SKRUVA IHOP BY-PASSEN
FIG 3: ASSEMBLING THE BY-PASS
FIG 3: MONTAGE DER BYPASS EINHEIT
FIG 2: MONTERA O-RINGARNA
FIG 2: ATTACHING THE WASHERS
FIG 2: MONTAGE DER DICHTUNGEN
FIG 4: ANSLUT SOLFÅNGARNA / SETTING UP EL NIÑO / AUFBAUVARIANTEN VON EL NIÑO
FIG 5: FLÖDESSCHEMA / FLOWCHART / ANSCHLUSSZEICHUNG
1. På marken - gärna på isolerande material
1. On the ground - preferably with isolating material beneath
1. Auf dem Boden
2. El Niño Monteringsstativ eller på ett annat stativ 0-30 grader
2. The El Niño Mounting Frame, or placed on a stand, 0-30 degrees
angle recommended
2. Auf einem Gestell
3. Vertikalt. OBS! Pumpens kapacitet kan begränsa möjlig montage-
höjd. Alternativt kan El Niño Booster pump användas.
3. Vertically. NB! The lifting capacity of the pump will limit the
maximum height possible. An alternative is to install the El Niño
Booster pump.
5
NOTE! For best performance the solar collectors should be placed:
• Vindskyddat / Protected from the wind / Windgeschützt
• Inga skuggande objekt / WIth no shading obstacles
• Direkt mot solen / Facing directly towards the sun / Direkt zur Sonne gerichtet