CESSNA®
MODEL 525B
MAINTENANCE MANUAL
Table 12. Interior Bus #2 (HZ016) (continued)
Circuit Breaker
Equipment
Number of Units
Equipment Load
(Amps DC)
Notes
Refreshment Ctr
Drain Tube Htr
(TC004)
1
0.33
Copilot Drain Tube
Heater (TC006)
1
0.33
Aft Drain Tube
Heaters (TT004)
1
0.33
Drain Tube Heater
(HZ099)
Flush Toilet
(MC004)
1
7.50
Bus Calculated Load
32.49
Table 13. LH #1 CB Power Bus (HZ035)
Circuit Breaker
Equipment
Number of Units
Equipment Load
(Amps DC)
Notes
LH Max Cool
Solenoid
1
0.62
A/C Control
(HZ055)
RH Max Cool
Solenoid
1
0.62
Compressor
(HZ055)
Max Cool Inhibit
Relay (KZ070)
1
0.10
HZ067
Limiter Fault - LH
1
HZ065
Bus Sense - LH
1
0.06
HZ051
ENG PT2/TT2
HTR-LH (UZ003)
1
4.00
Wing Anti-Ice
System - LH
(HZ053)
LH Wing A/I Valve
(VT023)
1
1.00
Landing Light - LH
(HZ061)
Landing Light - LH
(FL003)
1
4.00
24-55-01
Page 15
© TEXTRON AVIATION INC.
Feb 23/2022
ICA-525B-34-00004
Form 2261 Rev 1