Home page
Contents
5. ENGINE REMOVAL
Precautions in Operation ..................... 5-1
Removal of Engine ............................... 5-2
Engine Installation ................................ 5-6
Precautions in Operation
General Information
●
The engine has to be supported with special service tools that can be lifted or adjustable.
●
Engine shall be removal in the conditions of necessary repair or adjustment to the only.
5
●
The following parts can be serviced as engine mounted on frame:
Carburetor.
Drive pulley, drive belt, clutch, and movable drive face assembly.
Start motor.
AC. Generator, oil pump and start one way clutch.
Transmission.
Specification
Item Capacity
Engine oil capacity
Replacement 1200 c.c.
Disassembly 1400 c.c.
Gear oil capacity
Replacement 650 c.c.
Disassembly 750 c.c.
Engine & radiator
780 c.c.
Coolant capacity
Reservoir
420 c.c. AS indicator shown
Total 1200 c.c.
Torque Value
Engine hanger bolt
7.5~9.5kgf-m
Exhaust muffler mounting bolt
2.8~3.2kgf-m
Exhaust muffler connection nut
1.0~1.4kgf-m
5-1
PDF created with pdfFactory Pro trial version
www.pdffactory.com