background image

Professional 75lb Dual Impeller 

Broadcast Spreader

MODEL #DI2020

ASSEMBLY INSTRUCTIONS

P80000_M52098_Rev_June2020

Professional 75lb Dual Impeller 

Broadcast Spreader

MODEL #DI2020

ASSEMBLY INSTRUCTIONS

PAGE 1

Thank you!

IN THE BOX

You have purchased the highest quality professional 

broadcast spreader on the market.  Featuring an 

advanced design duel impeller system. This spreader 

provides a symmetrical spread pattern, eliminating the 

potential for uneven application. The dual impeller design 

provides superior flexibility in spreading a variety of 

granule types and seeds. A single adjustment of the rate 

plate is all that is required to deliver a uniform application 

each time.

While your spreader is mostly assembled, to minimize 

shipping costs, you will need to attach the tires, frame 

rest, upper handle, and control rods. 

Before you begin, you will need the following tools to 

assemble your DI2020 spreader:

Two 7/16” box wrenches,

One 1/2”

One 3/8” box wrench

(2) Control Rods

Helpful Hints 

(1) Deflector

Control

Rod

(2) Tires

P15043

(1) Frame Rest

79008

(1) Upper Handle

Assembly

60368

(1) Hopper 

Frame 

Assembly

Other Items:

(1) Rain cover

(1) Hopper screen

(1) Hardware pack

The hardware kit include additional spare hardware:

- Cotter pin (for retaining tire)

- (2) 2 ¼” stainless bolts 

- (2) ¼” stainless nuts

Summary of Contents for DI2020

Page 1: ...variety of granule types and seeds A single adjustment of the rate plate is all that is required to deliver a uniform application each time While your spreader is mostly assembled to minimize shippin...

Page 2: ...ation to the centerline of the spreader A Inboard B Outboard Locate two quick release tire clips from the hardware bag Orient both tires with the longer portion of the hub facing inward 4 1 4 2 Spring...

Page 3: ...nylon lock nuts 6 2 are needed to make the assembly Install but do not tighten the lock nuts until next step Figure 6 6 Complete the rest assembly by utilizing the two bottom holes Reinsert the two 1...

Page 4: ...els Place handles inside of the rest as shown in the outlined box below and pull upward to mate the handle in place with the rest Attach the upper handle to the frame rest installed in Step 6 using fo...

Page 5: ...e brackets must be in an upright position Once the control rods are inserted place the remaining two 5 16 hex nuts 8 1 on the bottom of the control rod Finger tighten these nuts in place they will be...

Page 6: ...deflector spring 9 1 onto the coined end of the deflector control rod 9 2 9 1 9 3 1 x 1 x 9 2 9 1 9 2 9 1 Place deflector control rod grip 9 3 on the top end of the deflector control rod Insert deflec...

Page 7: ...interior shape 10 1 STEP 11 Place hopper rain cover on the unit STEP 12 Remove the four gear box cover halves Using a grease gun lightly lubricate grease fittings 12 1 on the axle bearing housings and...

Page 8: ...s 13 2 13 1 13 2 STEP 14 Remove the lever tether pin 14 1 so that the handles move independently Each side is to be calibrated individually For this process it is best to Have your unit on the ground...

Page 9: ...be more closed see threading detail at right STEP 16 To adjust shutoff for BASELINE calibration Tool required two 1 2 wrenches Push that lever forward to the open position and loosen the nuts 16 1 Th...

Page 10: ...s The rate setting is achieved by loosening the rate control knob and sliding the rate control plate until the pointer aligns with desired letter 1 When filling the hopper make sure both operating han...

Page 11: ...bind The Andersons to any affirmation representation or warranty concerning the Product and any affirmation representation or warranty made by any agent employee or representative shall not be enforc...

Reviews: