background image

P80000_M52098_Rev_June2020

ASSEMBLY & OPERATIONS MANUAL

PAGE 3

ASSEMBLY: 

continued

STEP 6:  Position the spreader laying forward on 

wheels and hopper as shown in Figure 6.3. 

Figure 6.4 - Remove the cross brace by removing 

two bolts and lock nuts.  Keep the hardware for 

reinstallation in step 6.6. 

Figure 6.5 - Attach the lower frame rest to the 

hopper assembly utilizing the two top holes.  Two 

(6.1) 1/4”x 2-1/4” bolts and two 1/4-20 nylon lock 

nuts (6.2) are needed to make the assembly.  

Install but do not tighten the lock nuts until next 

step.

Figure 6.6 – Complete the rest assembly by  

utilizing the two bottom holes.  Reinsert the two  

1/4”x 2-1/4” bolts that were removed in step 6.4 

through the rest, then the frame, then the cross 

brace.  Install two 1/4-20 nylon lock nuts (6.2) and 

now tighten all four lock nuts. 

Figure 6.4 – Remove cross brace by removing 2 bolts and

lock nuts

6.1

6.2

4 x

4 x

Figure 6.3 - Starting Position – Attach Rest to Frame

Figure 6.5 – insert bolts and loosely tighten lock

nuts

6.2

Figure 6.6 – insert brace and tighten bottom lock nuts

6.2

Summary of Contents for DI2020

Page 1: ...variety of granule types and seeds A single adjustment of the rate plate is all that is required to deliver a uniform application each time While your spreader is mostly assembled to minimize shippin...

Page 2: ...ation to the centerline of the spreader A Inboard B Outboard Locate two quick release tire clips from the hardware bag Orient both tires with the longer portion of the hub facing inward 4 1 4 2 Spring...

Page 3: ...nylon lock nuts 6 2 are needed to make the assembly Install but do not tighten the lock nuts until next step Figure 6 6 Complete the rest assembly by utilizing the two bottom holes Reinsert the two 1...

Page 4: ...els Place handles inside of the rest as shown in the outlined box below and pull upward to mate the handle in place with the rest Attach the upper handle to the frame rest installed in Step 6 using fo...

Page 5: ...e brackets must be in an upright position Once the control rods are inserted place the remaining two 5 16 hex nuts 8 1 on the bottom of the control rod Finger tighten these nuts in place they will be...

Page 6: ...deflector spring 9 1 onto the coined end of the deflector control rod 9 2 9 1 9 3 1 x 1 x 9 2 9 1 9 2 9 1 Place deflector control rod grip 9 3 on the top end of the deflector control rod Insert deflec...

Page 7: ...interior shape 10 1 STEP 11 Place hopper rain cover on the unit STEP 12 Remove the four gear box cover halves Using a grease gun lightly lubricate grease fittings 12 1 on the axle bearing housings and...

Page 8: ...s 13 2 13 1 13 2 STEP 14 Remove the lever tether pin 14 1 so that the handles move independently Each side is to be calibrated individually For this process it is best to Have your unit on the ground...

Page 9: ...be more closed see threading detail at right STEP 16 To adjust shutoff for BASELINE calibration Tool required two 1 2 wrenches Push that lever forward to the open position and loosen the nuts 16 1 Th...

Page 10: ...s The rate setting is achieved by loosening the rate control knob and sliding the rate control plate until the pointer aligns with desired letter 1 When filling the hopper make sure both operating han...

Page 11: ...bind The Andersons to any affirmation representation or warranty concerning the Product and any affirmation representation or warranty made by any agent employee or representative shall not be enforc...

Reviews: