quest
quest
1-877-420-1330
Quest DRY 180 Installation, Operation and Maintenance Instructions
4
www.QuestHydro.com
Info@QuestHydro.com
1. Intended Application for Quest DRY 180
The Quest Dry 180 is designed to be installed overhead, can be placed on a shelf, or set on the floor for
immediate plub and play performance. When extra space is required an optional duct kit is available, which
allows the Quest Dry 180 to be placed outside of the structure or room.
2. Registrations
The Quest Dry 180 conforms to UL STD 474 and CSA Standard C22.2 No.92.
3. Specifications
Part No:
4026237
Electrical:
110-120 VAC, 6.7 Amps, 60 Hz, grounded
Water Removal Capacity: 90 pints/day @ 80°F, 60% RH
Operating Temp. Range: 33°F min., 110°F max.
Air Flow:
220 CFM
Refrigerant Charge:
1 lb. R410A
Filter Size:
12" X 12" X 1"
Size:
34"L X 14 1/2"W X 19 1/2"H
Unit Weight:
67 lbs.
Shipping Weight:
73 lbs.
4. Unit Assembly
4.1 Installing Feet (Optional)
Included with your Quest Dry 180 are four leveling feet. It is important to level the unit for proper draining.
(See section 5.1.4, Figure 6)
Installing Leveling Feet
S
ee Figures 2 and 2a for installing leveling feet.
1. Lay down a protective pad (pillow, blanket, etc.).
2. Carefully turn unit onto side opposite filter opening and drain port.
Figure 1: Four leveling feet
Figure 2: Insert leveling feet in
locations
Figure 2a: Screw each leveling
foot in ten revolutions