English 10
4.
After removing the pallet bolts with two ½” (13mm)
wrenches (one to hold bolt at the bottom while the
other is loosening the nut at the top), the range may be
lifted and removed from the pallet.
5.
Due to the weight, a furniture dolly with soft wheels or
an air lift should be used to move this unit. The weight
must be supported uniformly across the bottom
(
).
6.
After transporting the range by dolly close to its final
location, the range can be tipped back and supported
on the rear legs while the dolly is carefully removed.
THE FLOOR UNDER THE LEGS SHOULD BE
PROTECTED BEFORE PUSHING THE UNIT INTO
POSITION.
•
The anti-tip device must be installed (
), gas and electrical
connections should be made (
Requirements, Connection & Grounding”
), and the
backguard installed (
) before the range is placed
in its final position.
•
For proper performance, the
range must be level
.
See
“Step 9: Placing and Leveling the Range” on
7.
Replace the kick panel.
It is important that the
screws retaining the kick panel are secure to
prevent accidental access to hot surfaces
.
8.
Ensure that the burner caps are correctly seated on the
burner bases of the rangetop.
•
Remove all tape and packaging before using the
appliance. Please, recycle the packaging material,
as all THERMADOR
®
appliance packaging
material is recyclable. Never allow children to play
with packaging material.
Figure 5: Removal of the Four Shipping Bolts
Figure 6: Dolly Positioning
Pallet
Range must be
uniformly
supported
by braces
provided
on bottom
of range