Form: 2435-3
Arctic Installation and Operation Manual
Revision: 10
P/N 105641-01
Date: 12-1-2018
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601
Web:
Phone:
717-239-7642
Fax:
877-501-5212
Email:
26
Model
40 F
Δ
T Flow Rate
gpm
Δ
P
(ft)
High
Fire
Δ
T
Low
Fire
Δ
T
ARC1000
48
3.18
40F
8F
ARC1500
71
2.3
40F
8F
ARC2000
95
4.08
40F
8F
ARC2500
119
5
40F
8F
ARC3000
143 7.18
40F
8F
ARC3500
166 2.67
40F
8F
ARC4000
190 3.17
40F
8F
ARC4500
214 6.25
40F
8F
ARC5000
238 7.92
40F
8F
ARC5500
261 9.25
40F
8F
ARC6000
285 9.42
40F
8F
Table 11 Water Flow Rates for Primary /
Secondary Pumping 40F
Δ
T
3.5.4.3
Water Flow Rates (Constant
Volume Primary Pumping Systems)
A constant volume primary pumping system
shall be sized so that the flow rate specified in
Table 12 can be maintained through each
boiler connected to the system.
Model
Maximum Flow Rate
gpm
Δ
P
(ft)
High Fire
Δ
T
ARC1000
95
12.7
20F
ARC1500
143
9.2
20F
ARC2000
190
16.3
20F
ARC2500
238
20
20F
ARC3000
285
28.7
20F
ARC3500
333
11.33
20F
ARC4000
380
15.17
20F
ARC4500
428
25.17
20F
ARC5000
475
33.5
20F
ARC5500
523
37.25
20F
ARC6000
570
37.92
20F
Table 12: Water Flow Rates for Constant
Volume Primary Pumping
3.5.4.4
Water Flow Rates for Glycol
For glycol systems the gpm in Table 8, Table
Table 10, Table 11, and Table 12 will increase
as specified in Table 13.
Glycol
Concentration
GPM Percent Increase
50%
24%
30%
14%
Table 13 GPM Increase for Glycol Systems
3.6
Before Placing Boiler In Operation
3.6.1
Pre-Boil Out Flushing Of System
Much of the dirt and contamination in a new
hot water system can be flushed out before
the boil out of the system. First, flush the
system of waste with clear water. The boiler
and circulating pumps must be isolated
through the successive zones of the system to
waste, carrying metal shavings, dirt, pipe joint
compound, etc. with it. Follow with a