Figure 11: Panel Removal in Preparation for Tube Inspection-ARC3500-ARC6000
Note: Tubes are accessed and serviced from both sides of the ARC3500-ARC600 Boilers. (
Right side exploded
view not shown
.)
1.
Loosen tube-ends. Insert tube puller between the tube-end and header. Apply pressure to the
puller and strike the side of the tube two or three times with a hammer to help loosen the tube-
end in the upper and lower header.
2.
Pull lower tube end. Wedge the tube puller under the flange of the tube. Drive the tube puller
with several blows with a hammer on the end of the handle. Alternate with downward blows to
lift tube-end.
3.
Clear tube-end from the header. Continue driving wedge under and leveraging flange up until it
pops the end of the tube free from the hole in the header.