possible vertical way between expansion tank and boiler. If the circulation pump is installed on return line, 
and the head of pump at maximum speed is "h", the vertical distance (h) given in above scheme must be 
achieved within the system design (h, being the vertical distance between the top radiator of the circuit and 
bottom  level  of  open  expansion  tank).  If  h  is  not  achieved  in  such  system,  there  will  be  air  suction  on 
radiators at highest level of circuit. In this case, the pump must be installed on delivery line from boiler. 

A hydrometer must be installed on the delivery line to monitor the pressure level and to check if there is any 
leakage. The hydrometer should be purchased separately, and should be installed at the same level with 
the boiler outlet. A by-pass line should be installed between inlet and outlet connections of circulation pump 
in  order  to  allow  maximum  water  delivery  when  circulation  pump  is  switched  off  and  there  is  fuel  fired  in 
boiler, particularly during sudden electricity cuts off. 

NOTICE 

 

The optional safety heat exchanger kit is highly recommended to be used with the boiler, even in 

the  case  of  open  vented  systems  to  protect  the  boiler  and  the  whole  heating  circuit  against 
excessive heat accumulation. For installation of this kit, please refer to the next section.

 

 

NOTICE 

 

When water temperature in hydraulic circuit is relatively low, particularly when solid fuel is just fired, 
it is normal for water vapour in flue gases to condense. Condensation rarely creates a problem for 
the boiler, as it will stop when boiler becomes hot. However, the boiler should not be operated in 
fully condensing mode. When you open loading door, if chamber walls are wet, it means that there 

is  condensation  in  flue  gases.  Continuous  condensation  does  not  only  create  massive  tarrs  on 
combustion  chamber  heating  surfaces,  but  also  has  little  effect  on  boiler  lifetime.  We  will 
recommend you to follow one of the following methods to control condensation rate in the boiler: 
1.  You  can  install  a  thermostatic  three  way  mixing  valve  between  delivery  and  return  line  of  the 

boiler as described in above circuit scheme. Here, three way valve should preferably be set to 40 

o

C. Then, water will by-pass directly between delivery and return of the boiler, until the return water 

temperature reaches up to 40 

o

C.   

2.  You  can  control  circulation  pump  by  means  of  a  thermostat  that  can  be  attached  delivery  or 

return of the boiler. If thermostat is on the return line, it should be set to 40 

o

C, if it is on the delivery 

side, set to 55 - 60 

o

C. As the pump will not start unless water temperature rise up to the set value, 

boiler warms faster, and condensation mode is minimized. 

 

 

5.3. Design parameters for open expansion tank   

 

Expansion  tank  protects  hydraulic  circuit  from 
excessive  temperatures  by  allowing  free  volume 
for  expanding  water  and  keeping  the  water 
pressure  from  exceeding  the  static  pressure. 
Expansion tank may be built in rectangular   prism 
or cylindrical shape, may be installed in horizontal 
or  vertical  position  in  the  system.  Safety  lines 
between  boiler  and  expansion  tank  should  be 
installed  by  an  increasing  slope  up  to  tank. 
Following  scheme  shows  the  maximum  vertical 
distances between safety lines and boiler:   

 

 

 

 

 

The size of expansion tank can easily be calculated regarding the total expanding water contained in whole 
system. If the total volume of water in the system is V

s

; the volume of expansion tank should be: 

 

Vg= 8.Vs / 100 (in litres) 

 

 

SV: Delivery safety line 
SR: Return safety line 

Summary of Contents for KAPPA KP10

Page 1: ...Installation and User Manual ...

Page 2: ... but also its efficient and low emission operation Manufacturer s Declaration of Conformity EC We BOYSIS MAKINE TAAHHUT SANAYI VE TICARET A S located at Şerifali Mahallesi Hüsrev Sokak No 2 Erişkenler Plaza Kat 3 34775 Ümraniye İstanbul Turkey certify under our sole responsibility that the equipment specified below has been designed manufactured and inspected by the relevant provisions of the Pres...

Page 3: ...nside the boiler a safety valve to activate the heating system at high water temperatures and auxiliary accessories for installation Whether the hydraulic circuit is open vented or pressurised this safety heat exchanger system should be utilized for meeting the regulations of related European standard for this product as well as safety of whole heating installation and boiler itself 2 SAFETY WARNI...

Page 4: ...or handles Use gloves for performing all work and fuel loading Do not open ash door reach into the ash chamber Do not clean the boiler until it has been allowed to cool down NOTICE Damage to property Do not feed cold water directly to the boiler overheated by any reason This may result in noise production in the system and or permanent damage on boiler body Do not drain water in hydraulic circuit ...

Page 5: ...clearance upper door mmxmm Max Fuel loading height for log wood mm Max Logwood length mm 200 300 400 500 600 700 800 900 Temperature control range ºC Maximum operating temperature ºC Maximum operating pressure bar Water flow return connections D G Filling draining connection G External dimensions L mm 525 625 725 825 925 1025 1125 1225 L1 mm 380 480 580 680 780 880 980 1080 Flue outlet diameter D ...

Page 6: ...in spaces where there are explosive and combustible materials The boiler room should have air ventilation holes through outside to let fresh air in One air ventilation hole must be built maximum 40 cm below the level of room ceiling the other must be built maximum 50 cm above the floor level These ventilation holes should always be kept open The upper hole should be at least 40x40 cm in size the l...

Page 7: ...iler water temperature reach high values sharply with leaving the pump switched off In that case very high thermal energy of return water to boiler could resut in permanent damage 5 2 Open vented hydraulic circuit Kappa boilers are preferred to be installed in a hydraulic circuit with an open type expansion tank in accordance with the following schemes The circulation pump may be installed on eith...

Page 8: ... loading door if chamber walls are wet it means that there is condensation in flue gases Continuous condensation does not only create massive tarrs on combustion chamber heating surfaces but also has little effect on boiler lifetime We will recommend you to follow one of the following methods to control condensation rate in the boiler 1 You can install a thermostatic three way mixing valve between...

Page 9: ...C thermostat of the safety valve lets cold sanitary water flows through the serpentine of the safety heat exchanger Serpentine with cold water circulating inside cools down the boiler water temperature When the boiler temperature decreases below the safe degree safety valve shuts the cold sanitary water circulation and the boiler goes back to normal operation NOTICE The valves on the sanitary conn...

Page 10: ...terial that is permeable to gases The original system filling water and any topping up water must always be filtered using synthetic or metal mesh filters with a filtration rating of no less than 50 microns to prevent sludge from forming and triggering deposit induced corrosion 5 7 Chimney connection Your boiler must be connected to an individual chimney that will provide at least the minimum drau...

Page 11: ...st level of chimney outside should be in accordance with the dimensions given in following sketch so as to minimize the harmful effect of flue gasses on ambient and to improve draught in chimney LESS THAN 20 ...

Page 12: ...eed the whole system with water to check any leak Start assembly of accessories pack 2 Loosen M10 nuts holding front door hinges a bit in order to fit side panels 3 Put boiler body insulation squarely onto boiler body Then fix side and left panels On front side of boiler use four pieces M10x16 setscrews together with M10 washers for left hand side panel For right hand panel just tighten the existi...

Page 13: ... pack onto circular port on top panel attach its sensing element into the pocket phial on front section as shown below Then fit top panel with four pieces 4 2x9 5 self tapping screws 6 Fit L shaped arm supplied with thermostatic regulator into its seating port and secure with its original screw Attach one end of chain on the end of arm Attach the other end of the chain on primary air damper as sho...

Page 14: ... safety heat exchanger as shown on the picture right hand side Pay attention to the cold sanitary water flow through safety valve This is indicated on brass body of safety valve 3 There are two ports sized 1 2 for sanitary water inlet and outlet connection on safety heat exchanger These ports are welded to copper serpentine of the exchanger Attach outlet of Regulus JBV valve to one of these 1 2 po...

Page 15: ...iler with a pellet burner the pellet burner door have to be assembled to the boiler as explained in following photos and instructions 1 Remove the fire door and the hinge sheet metal part The fire door is used when the boiler is operated manual loading with wood log and coal 2 Remove M10 setscrews that fix left hand side panel to front section of boiler Fit two pieces of sheet metal parts that wil...

Page 16: ...t the back as shown above These hinge pins can be adjusted for optimum position of pellet burner door 3 Hang the pellet burner door using two pieces of twisted pins supplied in the pack onto front section of boiler Details can be seen at following pictures Use the screwed knob and bush to close the door tightly as shown in the picture ...

Page 17: ...at 1 Boiler and circuit are filled with water and the hydraulic pressure is in the required range 2 All valves on the line except by pass lines and start level line are in open position 3 There is enough draught in chimney 7 3 Firing 1 Set the kindling Place fire starters crumpled newspaper 3 or 4 sheets balled up fairly tightly on the grate of the boiler Place small kindling over the paper or sta...

Page 18: ...mpletely put off Never let the boiler water temperature reach high values sharply with leaving the pump switched off In this case the instant cold water delivery to the very hot boiler may result in cracks on boiler body due to high thermal energy If the thermo regulator does not operate properly shift its setting step by step according to your comfort conditions 7 7 Lack of chimney draught If the...

Page 19: ...lants grey paste compound ceramic fibre boards 1 These materials contain organic solvents and should be used in well ventilated area away from naked flames Do not allow to come into contact with the skin eyes inhale or swallow 3 Use barrier cream or gloves to protect the skin and goggles to protect the eyes from accidental contact 4 Small quantities can be removed from clothes or skin with a propr...

Page 20: ...gas flow 2 When adding solid fuel when there is active fire bed inside the combustion chamber protect your hands and face If needed wear protective gloves NOTICE Firing fuel 1 Do not take the firing fuel out from the combustion chamber while it is still burning 2 Do not try to put the firing fuel off using water or any other liquids 3 Do not leave the front doors and fire door open when there is f...

Page 21: ...s as well as fumes or odours So you should let more air re adjusting the primary air damper setting to get richer combustion If air is too much for combustion solid fuel will be consumed rapidly In this case we recommend to reduce air inlet by either primary air or flue damper on the smoke hood Check the heat transfer surfaces of cast iron sections The soot formation will change according to fuel ...