background image

4

ENGLISH

GENERAL INFORMATION

GENERAL INFORMATION

TECHNICAL SPECIFICATIONS

DESCRIPTION

TBSS

150

200

300

430

550

800

1000

Type of storage cylinder

Vertical, glazed

Heat exchanger layout

Vertical, with elliptical section

Vertical, with circular 

section

Storage cylinder capacity

162

207

305

445

555

735

890

l

Diameter of storage cylinder with insulation

604

604

604

755

755

974

974

mm

Diameter of storage cylinder without insulation

-

-

-

-

-

790

790

mm

Height with insulation

1088

1338

1838

1644

1988

1835

2155

mm

Height without insulation

-

-

-

-

-

1745

2070

mm

Insulation thickness

52

52

52

52

52

92

92

mm

Total net weight

62

78

103

131

157

203

225

kg

Quantity/diameter/length of magnesium anode

1/33/300 1/33/300 1/33/450 1/33/450 1/33/520 1/40/600 1/40/600

mm

Flange internal diameter

130

130

130

130

130

130

130

mm

Diameter/length of sensor sockets

16/180 16/180 16/180 16/180 16/180 16/180 16/180

mm

Coil water capacity

4,25

6,9

8,5

10,0

19,3

21,0

24,4

l

Coil heat exchange surface area

0,85

1,38

1,7

2

2,3

2,5

2,9

m

2

Maximum operating pressure of storage cylinder

10

7

bar

Maximum operating pressure of coils

10

7

bar

Maximum operating temperature

99

°C

Discharges according to EN 12897:2006 ∆T=45 °C 

(ambient 20°C and storage at 65°C)

55

58

68

73

84

95

103

W

Discharges according to UNI 11300

1,22

1,31

1,51

1,62

1,87

2,11

2,29

W/K

Energy class

B

B

B

B

B

B

B

Continuous availability of domestic water (DHW 10-45°C) at the different coil inlet temperatures and with the indicated 

delta (∆) T°.

Coil delivery temperature

80°C 

∆T 20°C

27

39

49

56

66

69

75

kW

660

950

1185

1380

1645

1728

1860

l/h

70°C 

∆T 20°C

19

28

37

40

49

53

57

kW

480

690

921

955

1207

1300

1403

l/h

60°C 

∆T 10°C

11

17

22

24

35

37

39

kW

280

410

528

580

860

910

960

l/h

50°C 

∆T 10°C

8

9

13

15

17

19

21,7

kW

190

200

319

370

408

460

534

l/h

Set-up time required to heat the boiler to 60°C (coil probe point reference) with primary exchanger at the indicated de-

livery temperature and with the indicated delta (∆) T°.

Coil delivery temperature
80°C 

∆T 20°C

35

34

38

37

32

50

52

min

70°C 

∆T 20°C

39

40

42

43

48

74

77

min

Set-up time required to heat the boiler to 55°C (coil probe point reference) with primary exchanger at the indicated de-

livery temperature and with the indicated delta (∆) T°.

Coil delivery temperature
60°C 

∆T 10°C

45

43

48

52

50

76

82

min

Set-up time required to heat the boiler to 45°C (coil probe point reference) with primary exchanger at the indicated de-

livery temperature and with the indicated delta (∆) T°.

Coil delivery temperature
50°C 

∆T 10°C

56

53

55

60

58

80

94

min

NL thermal efficiency coefficient according to DIN 4708. The NL index indicates a number of apartments having 3.5 peo-

ple that can be fully supplied, with a 140 l bathtub and two other drawing points.

Coil delivery temperature
80°C

1,84

2,6

3,28

4,06

4,87

5,9

6,83

70°C

1,44

2,01

2,63

3,12

3,86

4,9

5,67

60°C

1

1,36

1,81

2,2

2,5

3,7

4,23

50°C

0,75

0,86

1,26

1,59

2,01

2,37

2,68

Summary of Contents for TBSS 150

Page 1: ...TBSS 150 200 300 430 550 TBSS 800 1000 TBSS INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Page 2: ...to property or injury to persons or ani mals caused by improper installation adjustment main tenance or use b The product must be serviced at least once a year Servic ing must be arranged in advance...

Page 3: ...rosion magnesium anode IDENTIFICATION The T TBSS solar heaters can be identified by Data plate This lists the technical specifications and performance of the product BALLON Modele Model Fabrication Co...

Page 4: ...Continuous availability of domestic water DHW 10 45 C at the different coil inlet temperatures and with the indicated delta T Coil delivery temperature 80 C T 20 C 27 39 49 56 66 69 75 kW 660 950 118...

Page 5: ...ed to 55 C coil probe point reference and primary exchanger at the indicated delivery temperature considering an increase of the domestic water temperature of 30 C between inlet and outlet according t...

Page 6: ...ooth open Apply the upper insulation 2 and the upper cover 5 in order to insert the cover exert a light and homoge neous pressure Close the interlocking flaps L completely which were previously left w...

Page 7: ...431 561 635 622 717 641 706 mm E 523 687 793 780 875 799 864 mm F 663 827 993 980 1075 969 1034 mm G 920 1170 1670 1440 1784 1707 2032 mm H 1088 1338 1838 1644 1988 1835 2155 mm I 604 604 604 755 755...

Page 8: ...t are all open Switch the electricity supply ON at the mains power switch and at control panel switch if fitted TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brie...

Reviews: