Installation premises
T
THC GREY
steel boilers must be installed in a
dedicated boiler room, with adequately sized vents, in compli-
ance with applicable laws and standards.
If at all possible, the boiler should be installed on a raised base
to stop the burner fan sucking up dust and to facilitate installa-
tion of a condensate drain system.
The boiler condensate drain must be located above the height
of the lid of the system’s condensate neutraliser.
The gas supply pipe must be installed in such away that the
boiler’s panelling can be removed and the front door opened
without having to remove the burner.
b
In Belgium, boilers must be installed according to stand-
ards NBN D51.003, NBN D30.003, NBN B61.002 (heat
output < 70 kW), and NBN B61.001 (heat output >70
kW).
b
When installing the boiler, allow sufficient space around
it to access all safety and control devices and to permit
easy maintenance.
b
If the specific weight of the gas supply to the burner is
greater than the specific weight of air, install all electrical
parts at least 500 mm above floor level.
a
Do not install the boiler outdoors. It is not designed to
work outdoors and is not fitted with the necessary auto-
matic anti-frost systems to do so.
≥
1 m
≥
L
H1
≥
1 m
B
≥
1 m
L
~ 0,1
m
DESCRIPTION
THC GREY
150 210 270 350 450 600 800 1000 1250 1450
B - Width
750 750 850 850 900 900 1000 1000 1200 1250
mm
L - Length
1350 1350 1620 1820 1930 2140 2400 2700 2920 3100
mm
H1 - Overall height ( base)
1420 1420 1540 1540 1700 1700 2010 2010 2130 2280
mm
Summary of Contents for THC 1000 GREY
Page 1: ...THC 150 1450 GREY INSTALLATION OPERATION AND MAINTENANCE MANUAL ...
Page 37: ...37 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...
Page 38: ...38 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...
Page 39: ...39 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...