Preparing for initial startup
It is essential to perform the following checks before starting
up or testing the functioning of your
T
THC GREY
boiler. In particular, check that:
- The turbulators (1) are correctly positioned (vertical po-
sition) inside the heat exchanger tubes and the clips (2)
are resting against the wall (3) of the heat exchanger
1
2
3
- The water and gas cocks are open
- The expansion vessel is properly charged
- The working pressure in the heating circuit is over 1 bar
but below the maximum limit specified for the boiler
- The water circuits have been properly bled
- The mains power connections to the boiler and its ac-
cessories (burner, pump, control panel, thermostats,
etc.) have been properly made.
b
The phase-neutral polarity has been respected.
b
A ground (earth) connection is obligatory.
Initial startup
Once you have completed all the preparatory steps, proceed
as follows to start up the boiler for the first time:
- Turn the boiler’s mains power switch ON
- If the system is equipped with a temperature controller
or timer thermostat, make sure that it is switched on
- Turn the control panel power switch ON and make sure
that the green power indicator lights
- Make the settings as instructed in the instruction manu-
al for your control panel
- Adjust the timer thermostat/s or temperature controller
to the desired temperature (~20°C);
Technical Assistance Centre
Summary of Contents for THC 1000 GREY
Page 1: ...THC 150 1450 GREY INSTALLATION OPERATION AND MAINTENANCE MANUAL ...
Page 37: ...37 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...
Page 38: ...38 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...
Page 39: ...39 ENGLISH TECHNICAL ASSISTANCE CENTRE TECHNICAL ASSISTANCE CENTRE ...