44
SYSTEM CHECK LIST
All unit mounting hardware torqued to specifications.
No air gaps between unit and trailer wall.
Drain hose properly routed and secured.
Fuel tank properly installed.
Fuel lines properly routed and fuel fittings tightened securely.
Bulkhead properly designed and installed.
Battery secured correctly and all connections clean and tight.
Remote HMI mounted securely.
Run Pre-Trip Inspection (refer to Operator’s Manual).
Run unit under load for eight hours to properly break-in engine.
Release to customer.
Summary of Contents for HK-430 HO
Page 3: ...2 Release History Released Rev 0 09 11...
Page 10: ...9 BLANK PAGE...
Page 12: ...11 Trailer Container Requirements...
Page 14: ...13 Mounting Bolt Specifications and Installation Requirements...
Page 15: ...14 Unit Dimensions...
Page 16: ...15 HMI Remote Mount Dimensions...
Page 17: ...16 Status Light Dimensions Option Corner Mount Version Surface Mount Version...
Page 20: ...19 Group 31 Battery Dimensions Lug Connections Threaded Stud Connections...
Page 22: ...21 Uncrating and Installing the Unit...
Page 30: ...29 Installing the Fuel Tank Aluminum L Shaped 65 Gallon Option...
Page 34: ...33 Installing the Fuel Tank Steel Rectangle 65 Gallon Option...
Page 36: ...35 Installing the Fuel Tank Steel Rectangle 65 Gallon Option...
Page 42: ...41 Installing the Remote Status Light Option...
Page 44: ...43 Installing the Battery...
Page 46: ......