Unit Description
40
Figure 11: Zone 1 Cool and Zone 2 Heat
Zone 1 Cool and Zone 2 Heat
The CIS is closed so high pressure refrigerant
vapor leaves the compressor and flows through
the DPR to the Zone 2 hot gas line and the open
HGS2 into the Zone 2 evaporator. There, the
refrigerant heats the Zone 2 evaporator and
condenses into high pressure liquid. Because the
SLS2 is closed, the liquid refrigerant flows
through the LRCV2 and the liquid line to the
LLS1.
The LLS1 is open so the refrigerant flows through
the Zone 1 expansion valve into the Zone 1
evaporator. There, the liquid refrigerant cools the
Zone 1 evaporator as it evaporates into low
pressure vapor. The refrigerant returns to the
compressor through the SLS1, Suction Line,
SLCV1 and the accumulator.
In the condensing unit, the CIS valve closes and
opens to regulate head pressure. The purge valve
is opened continuously during heat to drain the
condenser coil.
Zone 1 Evaporator
1F. Zone 1 Liquid Line Solenoid (LLS1)-Open
2F. Zone 1 Liquid Return Check Valve
(LRCV1)-Closed
3F. Zone 1 Suction Line Check Valve
(SLCV1)-Open
4F. Zone 1 Suction Line Solenoid (SLS1)-Open
5F. Zone 1 Hot Gas Solenoid (HGS1)-Closed
Zone 2 Evaporator
1R. Zone 2 Liquid Line Solenoid (LLS2)-Open
2R. Zone 2 Liquid Return Check Valve
(LRCV2)-Open
3R. Zone 2 Suction Line Check Valve
(SLCV2)-Closed
4R. Zone 2 Suction Line Solenoid (SLS2)-Closed
5R. Zone 2 Hot Gas Solenoid (HGS2)-Open
Condensing Unit
6. Condenser Inlet Solenoid (CIS)-Closed/Open
(Pressure Dependent)
7. Condenser Inlet Check Valve
(CICV)-Closed/Open
8. Condenser Check Valve (CCV)-Closed
9. Purge Valve (PV)-Open
10. Purge Check Valve (PCV)-Open
1F
2F
4F
3F
9
6
7
8
3R
5R
4R
2R
1R
5F
10
Summary of Contents for SPECTRUM TS 30 SR NAD
Page 4: ...4 ...
Page 10: ...Table of Contents 10 ...
Page 20: ...Safety Precautions 20 ...
Page 51: ...Unit Description 51 Figure 19 Front View Figure 20 Back View AJA1350 AJA1500 ...
Page 52: ...Unit Description 52 1 On Off Switch Figure 21 Side View 1 ...
Page 60: ...Unit Description 60 ...
Page 80: ...SPECTRUM TS Operation 80 ...
Page 90: ...Electrical Maintenance 90 ...
Page 100: ...Engine Maintenance 100 Figure 130 Early TK 3 95 Fuel and Oil System Components ...
Page 102: ...Engine Maintenance 102 Figure 131 Late TK 3 95 Fuel and Oil System Components ...
Page 104: ...Engine Maintenance 104 Figure 132 TK376 Fuel and Oil System Components ...
Page 136: ...Refrigeration Maintenance 136 ...
Page 156: ...Hilliard Clutch Maintenance 156 ...
Page 158: ...Structural Maintenance 158 ...
Page 168: ...Remote Evaporator Specifications 168 ...
Page 170: ...Remote Evaporator Maintenance Inspection Schedule 170 ...
Page 176: ...Remote Evaporator Electrical Maintenance 176 ...
Page 180: ...Remote Evaporator Refrigeration Service Operations 180 ...
Page 182: ...Remote Evaporator Structural Maintenance 182 ...
Page 184: ...Remote Evaporator System Diagnosis 184 ...
Page 188: ...Wiring and Schematic Diagrams Index 188 ...
Page 189: ...189 Wiring Diagram Page 1 of 4 ...
Page 190: ...190 Wiring Diagram Page 2 of 4 ...
Page 191: ...191 Wiring Diagram Page 3 of 4 ...
Page 192: ...192 Wiring Diagram Page 4 of 4 ...
Page 193: ...193 Schematic Diagram Page 1 of 3 ...
Page 194: ...194 Schematic Diagram Page 2 of 3 ...
Page 195: ...195 Schematic Diagram Page 3 of 3 ...
Page 196: ...196 ...