SPECTRUM™ TS Operation
79
The Defrost cycle should end automatically.
NOTE: The unit will not defrost unless the
evaporator coil temperature is below 45 F (7 C).
Loading Procedure
1. Make sure the unit is Off before opening the
doors to minimize frost accumulation on the
evaporator coil and heat gain in the truck.
(Unit may be running when loading the truck).
2. Spot check and record load temperature while
loading. Especially note any off-temperature
product.
3. Load the product so that there is adequate
space for air circulation completely around the
load. Do not block the evaporator inlet or
outlet.
4. Products should be pre-cooled before loading.
Thermo King units are designed to maintain
loads at the temperature at which they were
loaded. Transport refrigeration units are not
designed to pull hot loads down to
temperature.
Post Load Procedure
1. Make sure all the doors are closed and locked.
2. Start the unit if it was shut off to load.
3. Make sure the setpoint is at the desired setting.
4. One-half hour after loading, defrost the unit
by momentarily pressing the Manual Defrost
switch. If the evaporator coil sensor
temperature is below 45 F (7 C), the unit will
defrost. The microprocessor will terminate
defrost automatically when the evaporator coil
temperature reaches 52 F (11 C) or the unit
has been in the Defrost mode for 30 to 45
minutes (depending on setting).
Post Trip Checks
1. Wash the unit.
2. Check for leaks.
3. Check for loose or missing hardware.
4. Check for physical damage to the unit.
Summary of Contents for SPECTRUM TS 30 SR NAD
Page 4: ...4 ...
Page 10: ...Table of Contents 10 ...
Page 20: ...Safety Precautions 20 ...
Page 51: ...Unit Description 51 Figure 19 Front View Figure 20 Back View AJA1350 AJA1500 ...
Page 52: ...Unit Description 52 1 On Off Switch Figure 21 Side View 1 ...
Page 60: ...Unit Description 60 ...
Page 80: ...SPECTRUM TS Operation 80 ...
Page 90: ...Electrical Maintenance 90 ...
Page 100: ...Engine Maintenance 100 Figure 130 Early TK 3 95 Fuel and Oil System Components ...
Page 102: ...Engine Maintenance 102 Figure 131 Late TK 3 95 Fuel and Oil System Components ...
Page 104: ...Engine Maintenance 104 Figure 132 TK376 Fuel and Oil System Components ...
Page 136: ...Refrigeration Maintenance 136 ...
Page 156: ...Hilliard Clutch Maintenance 156 ...
Page 158: ...Structural Maintenance 158 ...
Page 168: ...Remote Evaporator Specifications 168 ...
Page 170: ...Remote Evaporator Maintenance Inspection Schedule 170 ...
Page 176: ...Remote Evaporator Electrical Maintenance 176 ...
Page 180: ...Remote Evaporator Refrigeration Service Operations 180 ...
Page 182: ...Remote Evaporator Structural Maintenance 182 ...
Page 184: ...Remote Evaporator System Diagnosis 184 ...
Page 188: ...Wiring and Schematic Diagrams Index 188 ...
Page 189: ...189 Wiring Diagram Page 1 of 4 ...
Page 190: ...190 Wiring Diagram Page 2 of 4 ...
Page 191: ...191 Wiring Diagram Page 3 of 4 ...
Page 192: ...192 Wiring Diagram Page 4 of 4 ...
Page 193: ...193 Schematic Diagram Page 1 of 3 ...
Page 194: ...194 Schematic Diagram Page 2 of 3 ...
Page 195: ...195 Schematic Diagram Page 3 of 3 ...
Page 196: ...196 ...