Solar Panel Installation Best Practices
IMPORTANT: For the solar panel to adhere properly, both the application surface and air
temperature must be above 45 F (7 C).
•
Switch unit controls to the off position and disconnect the positive battery cable.
•
Always ensure solar panel fuse (located on the harness) is removed during installation and service.
•
Clean the surface with isopropyl alcohol or appropriate de-greasers to completely clean of dirt and
grease before installing panel. All cleaning residue must be removed and the surface completely dry.
•
Care should be taken when installing solar panel as the adhesive backing is very aggressive. Once
installed, the panel cannot be removed without causing permanent damage to the panel and possibly
the mounting surface. If the panel is intended to be removed in the future, use only the supplied
fasteners, not the adhesive backing to secure.
•
Install the charge controller near the battery to be charged or the electrical connections (e.g., starter
motor, alternator) to avoid voltage loss in the cable
Panel Installation
NOTE: “Solar Panel Installation Best Practices” on page 3.
1. Switch unit controls to the off position and disconnect the positive battery cable.
2. Clean an area on the roof of the cargo box for the solar panel as shown - away from exhaust exit.
3. Peel back approximately 4 inches of the backing paper and position solar panel onto roof.
4. Remove remainder of backing paper and firmly press panel down over entire area.
•
Press several times to ensure entire panel is properly adhered to fairing.
NOTE: This is critical to prevent moisture between the surfaces.
Figure 3: Install Solar Panel onto the roof of the truck body as shown.
WARNING: Always wear safety glasses and protective gloves when working with batteries.
Summary of Contents for ThermoLite T-Series
Page 2: ...2 Figure 2 Solar Panel Kit Contents pictorial...
Page 8: ...8 Figure 7 Trailer Unit Shown Being Tested T Series Truck Similar...
Page 11: ......
Page 12: ......