All installations and services must be performed by qualified service personnel.
8
II. FURNACE SPECIFICATIONS
A. CLQS1 SERIES (Single Stage, Constant Torque Blower Motor)
MODEL NO.
CLQS1-050T
CLQS1-075T
CLQS1-100T
CLQS1-125T
BTU/Hr INPUT
50,000
75,000
100,000
125,000
BTU/Hr OUTPUT
48,000
73,000
96,000
120,000
HT. OF CASING
34-1/2”
34-1/2”
34-1/2”
34-1/2”
WIDTH OF CASING
17-1/2”
21”
21”
24-1/2”
DEPTH OF CASING
28-1/2”
28-1/2”
28-1/2”
28-1/2”
WARM AIR OUTLET
16-1/2 x 20
20 x 20
20 x 20
20 x 20
RETURN AIR INLET
25 x 16
25 x 16
25 x 16
25 x 16
DIA. OF FLUE
2”
2”
3”
3”
DIA. OF COMBUSTION
AIR INTAKE
2”
2”
3”
3”
CFM @ 0.2” & 0.5” w.c. STATIC
0.2” - 0.5”
0.2” - 0.5”
0.2” - 0.5”
0.2” - 0.5”
@HI SPEED (BLACK)
1360 - 1193
1531 – 1368
1762 – 1547
2047 – 1882
@MH SPEED (YELLOW)
1167 - 1000
1379 – 1210
1558 – 1391
1813 – 1617
@MED SPEED (BLUE)
987 - 797
1189 – 982
1416 – 1229
1710 – 1513
@ML SPEED (PURPLE)
827 - 610
1133 – 933
1357 – 1186
1553 – 1330
@LO SPEED (RED, HEATING)
672 - 420
1025 – 800
1178 – 976
1444 – 1180
TEMPERATURE RISE
60
60
60
60
BLOWER MOTOR HP
1/2
1/2
3/4
3/4
NO. OF SPEEDS
5
5
5
5
LARGEST RECOMMENDED
AIR CONDITIONER
3 Ton
3.5 Ton
4 Ton
5 Ton
SIZE OF FILTERS
24-3/4” x 15-3/4”
24-3/4” x 15-3/4”
24-3/4” x 15-3/4”
24-3/4” x 19-
3/4”
NOTES:
1. BTU output based on annual fuel utilization efficiency rated by manufacturer.
2. On all outlet and inlet dimensions, the first dimension is width.
3. Electrical characteristics at 120 volts, 60 Hz., 1 phase (less than 15 amps. for all models).
NOTES:
1. BTU output based on annual fuel utilization efficiency rated by manufacturer.
2. On all outlet and inlet dimensions, the first dimension is width.
3. Electrical characteristics at 120 volts, 60 Hz., 1 phase (less than 15 amps. for all models).
4. All specifications are subject to change without notice.
Summary of Contents for CLQS1-050T36N
Page 2: ......
Page 4: ......
Page 47: ...All installations and services must be performed by qualified service personnel 45...
Page 55: ...All installations and services must be performed by qualified service personnel 53...
Page 56: ...All installations and services must be performed by qualified service personnel 54...
Page 57: ...All installations and services must be performed by qualified service personnel 55...
Page 59: ...All installations and services must be performed by qualified service personnel 57...
Page 60: ...All installations and services must be performed by qualified service personnel 58...