All installations and services must be performed by qualified service personnel.
12
B.
FURNACE LOCATION
: These high efficiency condensing furnaces are not certified for and shall not be vented
into a standard or any type of chimney.
The following shall be considered for locating the furnace:
1.
For best performance locate the furnace so that it is centralized with respect to the duct system and as
near as possible to a floor drain since condensate drainage must be provided.
2.
Place the unit so that proper venting can be achieved, with a minimum number of elbows, in accord
with the instructions in this manual.
3.
The furnace must be located on a level, dry surface. The furnace must be installed so that the
electrical components are protected from water. If the area becomes wet or damp at times, the
furnace should be raised above the floor using a concrete base, bricks, patio blocks, etc.
NOTICE: Ensure furnace is level after installation to ensure proper drainage and operation.
4.
This furnace must be connected to a drain in accordance with these instructions. If it is not practical
to connect the unit to a drain, a condensate pump must be used and can be ordered as an accessory,
part number 350224. If an acid neutralizer kit is required by local code or the customer, it is available
under part number 320095.
5.
A Furnace installed in a residential garage must be installed so the burner and ignition source are
located higher than 18 inches above the floor. Also, the furnace must be located or protected to
avoid physical damage by vehicles.
6.
A gas fired furnace for installation in a residential garage must be installed as specified in Section III
of these instructions.
C. REPLACING EXISTING FURNACE FROM A COMMON VENT
: These furnaces may NOT be common vented with any other appliance.
D. GENERAL REQUIREMENTS FOR QUADPOISE CONFIGURATIONS
1. UPFLOW (as delivered)
a. Install plenum adapters (4) provided.
2. DOWNFLOW
a. Do not install plenum adapters to the warm air outlet of the furnace. They will not be used.
Summary of Contents for CLQS1-050T36N
Page 2: ......
Page 4: ......
Page 47: ...All installations and services must be performed by qualified service personnel 45...
Page 55: ...All installations and services must be performed by qualified service personnel 53...
Page 56: ...All installations and services must be performed by qualified service personnel 54...
Page 57: ...All installations and services must be performed by qualified service personnel 55...
Page 59: ...All installations and services must be performed by qualified service personnel 57...
Page 60: ...All installations and services must be performed by qualified service personnel 58...