All installations and services must be performed by qualified service personnel.
2
after turning off the gas supply. A final test for gas leakage must be made after
purging the gas line.
:
DO NOT wet electronic components during the leak test. Wetting
electronic components may damage circuitry and cause a hazardous situation.
Dry moisture from all leads and terminals if wetting occurs. Wait at least 24
hours for the circuit to fully dry before energizing the system.
:
The furnace and its gas valve must be disconnected from the gas
supply during pressure testing of the gas supply system at pressures in excess
of 1/2 PSIG or 14.0 inches W.G. The furnace can be isolated from the gas supply
by closing its manual shut off valve at test pressures equal to or less than 1/2
PSIG or 14.0 inches W.G.
:
Copper and brass tubing and fittings (except tin lined) shall not be
used if the gas contains more than a trace (0.3 grains per 100 cubic ft.) of
hydrogen sulfide gas. Check with your gas supplier.
:
If you suspect there is a problem with the furnace, the venting system
or any other related problem, immediately contact a qualified service agency. If a
service agency is not available, contact your fuel supplier.
:
Personal injury, or property damage, could result from major repair or
service of this furnace by anyone other than a qualified contractor. Only the
routine maintenance described in the user section of this manual should be
performed by the user.
:
Do not block or obstruct air openings on the furnace or air openings
communicating with the area in which the furnace is installed.
:
Do not allow the outside air intake to be blocked or obstructed by
vegetation, ice, snow or any other materials.
:
Do not use this furnace if any part has been underwater. Immediately
call a qualified service agency to inspect the furnace and to replace any part of
the electrical or control system, which has been underwater.
:
Should overheating occur or the gas supply fail to shut off, shut off the
manual gas supply valve to the furnace before shutting off the electrical supply.