Chapter 2
Installing Valves in the Heated Oven
Valve Installation
Operating Manual
21
Installing Valves in the Heated Oven
Installing valves consists of the following steps:
Step 1. Installing the solenoid
Step 2. Disassembling the valve and actuator
Step 3. Installing the valve and standoff
Step 4. Connecting gas lines from the solenoid to the actuator
Step 5. Installing the actuator to the valve standoff
Step 6. Testing the valve
CAUTION
Turn the actuator gas off before you start these procedures.
Step 1. Installing the Solenoid Valves
1. Locate the solenoid manifold in the rear floor of the valve compartment
(Figure 2-1). The space closest to the rear of the GC is reserved for
pneumatic valve 1, next is valve two, and so on.
A total of 6 pneumatic valves can be installed (up to 4 in the upper
compartment and up to 2 in the lower).
2. Remove the rectangular shaped cap from the manifold using the #0 phillips
screwdriver.
3. Secure the solenoid valve to the underplate using the two screws supplied
with the valve.
CAUTION
Tighten screws evenly, taking care that the solenoid gasket rests on all surfaces to
prevent leaks
Summary of Contents for Valve Oven
Page 1: ...Valve Oven Operating Manual ...
Page 18: ...Chapter 1 Valve Oven Overview Valve Oven Components 18 Operating Manual ...
Page 34: ...Chapter 2 Valve Installation Configuring Valves 34 Operating Manual ...
Page 42: ...Chapter 3 Operation Operating Valves Automatically 42 Operating Manual ...
Page 46: ...Chapter 4 Troubleshooting 46 Operating Manual ...
Page 52: ......
Page 60: ...Index 60 Operating Manual ...