Title: Installing the Nicolet iN5™ Microscope
Revision: 03
Procedure: Install-001
ECCN: EAR99
This document contains confidential or proprietary informat ion of Thermo Fisher Sc ientific. Ne ither this document nor
the information therein is to be reproduced, distributed, used or disclosed, either in whole o r in part, e xcept as
specifically authorized by Thermo Fisher Scientific.
1/4/2018
Page 1 of 84
Nicolet iN5
Part number:
912A0895 and 912A0922 w ith any of the follow ing view ing options:
840-287200
840-293700
840-287100
Part description:
Nicolet iN5 IR Microscope w ith MCTA and Nicolet iN5 IR Microscope w ith DTGS w ith any of the
follow ing view ing options:
840-287200 – Camera only
840-293700 – Binoc only
840-287100 – Trinoc and Camera
Functional description:
Point and Shoot Infrared Microscope compatible w ith a Nicolet iS10 or iS50.
Problems associated with this assembly:
Alignment, Detector evacuation, Optical contamination, Wear, Damage
Tools required:
Scissors
Box cutter
3-1 Tool
Small flat blade screw driver
Medium Flat blade screw driver
3/16 inch balldriver
5/16 inch T-w rench or L-w rench
5/32 inch ball driver
3mm Balldriver
Tw o- 3/32 inch balldriver
5/16 inch balldriver
Tw o- 5/64 inch balldrivers
0.05 inch balldriver
Needle nose pliers
Pow der-free gloves
Micrometer/S78 1MM /.01MM Reflected (Calibration slide) – Service rep needs to provide/not included w ith iN5
LN2 and proper safety equipment (for MCTA configurations)
Estim ated time required:
6-8 Hours depending on configuration
Notes:
1.
This procedure can be used to install both New Nicolet iN5 microscopes and aftermarket installations.
2.
Refer to page 3 for softw are and firmw are requirements.