Section 1
Universal (Aluminum) Platform Installation
18inch (Aluminum) Platform Installation
Rubber Mat Platform Installation
Connections of the Instrument
Section 2 Overview
Specifications
Environmental Conditions
Safety Tips
Storing the signal Cable
Output current of Control Box
Maximum Shaking Speed
Section 3 Operation
Operations on the Control Panel
Speed and Time Settings
Alarm System
Section 4 Application
Section 5 Safety Tips
Section 6 Optional Accessories
Section 7 Troubleshooting
Unpacking and Installation
Packing List
Contents
1
1
3
3
4
4
5
5
5
6
6
7
8
10
10
11
11
12
13
14
18
Thermo Scientific
Thermo Scientific
1
CO2 Resistant Shaker iii
1
CO2 Resistant Shaker iiii