background image

2

Kit Contents . . .

Tools Required . . .

Receiving, Storing and Handling . . .

1.  Inspect materials for damage incurred during shipping.

2.  Report damages to the carrier for settlement.

3.  Identify parts against the packing list to ensure the proper 

type and quantity has been received.

4.  Store in a dry location.

Dimensions . . .

Terminator

TM

 DE-B Beacon

Item

Quantity

Description

1

1

Expediter Assembly
    Grommet Compressor
    Grommet
    Support Base with O-Ring

2

1

Light Module Cover

3

1

Banding Guide

4

1

Banding (fi ts 10" pipe and below) 

5

1

LED Light Module

1

2

4

3

210mm

(8.25")

76mm

(3")

89mm

(3.5")

64mm

(2.5")

2

4

3

5

Order Separately . . .

SCTK Connection Termination Kits (per cable)

SCTK-1D

for BSX, RSX, VSX

SCTK-2D

for KSX, HTSX

SCTK-3D

for FP, HPT

Item

Quantity

Description

1

2

Connection Boots

2

2

Large Wire Nut

3

2

Medium Wire Nuts

4

2

Small Wire Nuts

5

1

RTV Tube

6

1

GRW-G Grommet (SCTK-3D only)

6

1

5

IP66/Type 4X   -60°C 

 Ta 

 +45°C

Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D, Zone 2 IIC T6
Class II, Division 2, Groups F & G, Class III

Certifi cations/Approvals . . . 

Installation Precautions . . .

•  To minimize the potential for arcing and fi re caused by product 

damage or improper installation use ground-fault protection. 
The National Electrical Code (NEC) and Canadian Electrical Code 
(CEC) require ground-fault protection of equipment for each 
branch circuit supplying electric heat tracing.

•  Installation must comply with Thermon requirements and be in-

stalled in accordance with the NEC, CEC, or any other applicable 
national and local codes.

•  Component approvals and performance ratings are based on 

the use of Thermon specifi ed parts only. User supplied power 
connection fi ttings must be listed or certifi ed for intended use.

•  De-energize all power sources before opening enclosure.

•  Keep ends of heating cable and kit components dry before and 

during installation.

•  Individuals installing these products are responsible for complying 

with all applicable safety and health guidelines. Proper personal 
protective equipment, or PPE, should be utilized during installa-
tion. Contact Thermon if you have any additional questions.

Reviews: