2
Kit Contents . . .
Tools Required . . .
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
4. Store in a dry location.
Dimensions . . .
Terminator
TM
DE-B Beacon
Item
Quantity
Description
1
1
Expediter Assembly
Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Light Module Cover
3
1
Banding Guide
4
1
Banding (fi ts 10" pipe and below)
5
1
LED Light Module
1
2
4
3
210mm
(8.25")
76mm
(3")
89mm
(3.5")
64mm
(2.5")
2
4
3
5
Order Separately . . .
SCTK Connection Termination Kits (per cable)
SCTK-1D
for BSX, RSX, VSX
SCTK-2D
for KSX, HTSX
SCTK-3D
for FP, HPT
Item
Quantity
Description
1
2
Connection Boots
2
2
Large Wire Nut
3
2
Medium Wire Nuts
4
2
Small Wire Nuts
5
1
RTV Tube
6
1
GRW-G Grommet (SCTK-3D only)
6
1
5
IP66/Type 4X -60°C
≤
Ta
≤
+45°C
Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D, Zone 2 IIC T6
Class II, Division 2, Groups F & G, Class III
Certifi cations/Approvals . . .
Installation Precautions . . .
• To minimize the potential for arcing and fi re caused by product
damage or improper installation use ground-fault protection.
The National Electrical Code (NEC) and Canadian Electrical Code
(CEC) require ground-fault protection of equipment for each
branch circuit supplying electric heat tracing.
• Installation must comply with Thermon requirements and be in-
stalled in accordance with the NEC, CEC, or any other applicable
national and local codes.
• Component approvals and performance ratings are based on
the use of Thermon specifi ed parts only. User supplied power
connection fi ttings must be listed or certifi ed for intended use.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before and
during installation.
• Individuals installing these products are responsible for complying
with all applicable safety and health guidelines. Proper personal
protective equipment, or PPE, should be utilized during installa-
tion. Contact Thermon if you have any additional questions.