background image

3

1. 

Locate bus connection (HPT and FP only) and 
cable as shown. Cut end of cable at angle to aid 
in piercing grommet. Leave additional cable for 
expansion loop. 

Terminator

TM

 DE-B Beacon

3. 

Slide expediter toward pipe and route cable 
through support base entry.

4. 

Insert banding guide into expediter and snap into 
place.

5. 

Mount expediter to pipe using pipe band. Do not 
band over cable.

2. 

Insert cable into expediter. If mounted on bottom 
of pipe, punch out weep hole.

6. 

Cut off end of cable. 

7. 

Terminate cable with appropriate SCTK termination 
kit. Refer to SCTK installation instructions. Push 
excess cable back through expediter. Tape cable 
expansion loop to pipe.   

8. 

Connect bus wires using small wire nuts (for BSX, 
HTSX and KSX) or medium wire nuts (for RSX, VSX, 
HPT and FP). See wiring schematic for connec-
tions.

50mm

(2")

Max.

300mm

(12")

Bus

Connection

Weep Hole

180mm

(7") Min.

Do Not Band

Over Cable

Wiring Schematic for LED Light

Light Module

Expediter Assembly

Wire Connector

Expediter Assembly

Boot

LED Light Pigtail

Heating Cable

Min.

300mm

(12")

Reviews: