background image

2

Kit Contents 

Item

Quantity

Description

1

1

Expediter Assembly 

    Support Cap with O-Ring 

    Threaded Grommet Compressor 

    Grommet 

    Support Base with O-Ring

2

1

Junction Box Lid

3

1

Junction Box Base with O-Ring

4

1

Nut

5

1

Banding

6

1

Banding Guide

7

1

Terminal Blocks with DIN Rail 

(Refer to terminal specifications for maximum 

allowable wire size)

8

1

Junction Box Cord

Dimensions 

Terminator

TM

 ZL                             

INSTALLATION PROCEDURES

Order Separately 
PETK Power and End Termination Kits (per cable)

PETK-1

for BSX, RSX, VSX-HT

PETK-2

for KSX, HTSX

PETK-3

for HPT, FP

Item

Quantity

Description

1

1

RTV Tube

2

1

Power Connection Boot

3

1

End Cap

4

1

Tape Strip 6" (PETK-3 only)

5

1

End Termination Caution Label

6

1

GRW-G Grommet (PETK-3 only)

7

1

Ground Sleeve

IP66/Type 4X  -60°C 

 Ta 

 +55°C

Listed Heat Tracing Cable System 137M

Ordinary & Hazardous Locations

Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T6...T4

09.2238691,-G,-S, Ex eb IIC T6...T4

Tools Required 

Certifications/Approvals  

Installation Precautions 

•  To minimize the potential for arcing and fire caused by product 

damage or improper installation use ground-fault protection. 

The National Electrical Code (NEC) and Canadian Electrical Code 

(CEC) require ground-fault protection of equipment for each 

branch circuit supplying electric heat tracing.

•  Installation  must  comply  with  Thermon  requirements  and 

be installed in accordance with the NEC, CEC, or any other 

applicable national and local codes.

•  Component approvals and performance ratings are based on 

the use of Thermon specified parts only. User supplied power 

connection fittings must be listed or certified for intended use.

•  De-energize all power sources before opening enclosure.

• Avoid electrostatic charge. Clean only with a damp cloth.
•  Keep ends of heating cable and kit components dry before and 

during installation.

• Individuals installing these products are responsible for 

complying with all applicable safety and health guidelines. 

Proper personal protective equipment, or PPE, should be utilized 

during installation. Contact Thermon if you have any additional 

questions.

 

FMG 10.0022X Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C 

1725           II 2 GD Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C FM 10ATEX0058X

1

2

6

4

3

8

5

7

1

2

6

4

3

5

7

Reviews: