2
Terminator ZP/FAK-1
The following installation procedures are suggested guidelines
for the installation of the Terminator ZP/FAK-1 Bulkhead Entry Kit.
Receiving, Storing and Handling
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
4. Store in a dry location.
Provided by others — 8 each 8-32 stainless steel bolts, washers
and nuts required.
Tools Required
PETK Power and End Termination Kits (per heater)
PETK-1D
for BSX, RSX, VSX-HT
PETK-2D
for KSX, HTSX
PETK-3D
for FP, HPT
Required:
Order Separately for each heater to be fabricated
A
mm (inch)
B
mm (inch)
C
mm (inch)
D
inch (mm)
Terminator ZP/
FAK-1
220 mm
(8-5/8”)
277 mm
(11-7/8”)
107 mm
(4-1/4”)
171 mm
(6-3/4”)
D
B
A
C
8
7
Terminator ZP/FAK-1 Kit Contents
Item
Quantity
Description
1
1
Expediter Assembly: Flat Mount Base, Grommet,
Threaded Grommet Compressor, and Support Cap
with O-Ring
2
1
Junction Box Lid
3
1
Junction Box Base with O-Ring
4
1
Nut
5
1
Terminal Blocks with DIN Rail (Refer to terminal
specifications for maximum allowable wire size)
6
1
Junction Box Cord
7
1
FAK-1 Cover (Top)
8
1
FAK-1 Cover (Bottom)
9
1
Heat Reflective Tape
10
2
RTV Sealant Tube
11
1
Glass Fiber Tape
12
1
Silicone Gasket
13
1
Self-Vulcanizing Tape
1
2
4
3
6
5
9
10
11
12
13
Dimensions