background image

 

 

ICE RINK DEFOGGER

I

CE 

R

INK 

D

EFOGGER 

MODELS

 

FOR APPLICATIONS FROM +80°F TO +30°F (+27°C TO -1°C

)

 

 

INSTALLATION, OPERATION AND MAINTENANCE

 

SERIES "IRD R404A"

 

IRD-050-4E 

IRD-050-5E 

IRD-050-7E  IRD-050-8E 

 

IRD-075-5E 

IRD-075-7E   IRD-075-8E 

 

IRD-100-5E 

IRD-100-7E   IRD-100-8E 

(208-240/1/60)  (208-230/3/60)  (460/3/60) 

(575/3/60) 

 

GENERAL 
Thermoplus  Air

  packaged  dehumidifiers  are 

designed for installation on a platform well above the 
ice  surface  -  (

Fig.  1

  recommended).  A  large  size 

platform must be provided for ease of installation and 

SERVICE

. The units must be suspended 

at least 15 

feet  (4.6  m) 

above  the  ice  surface.  For  lower 

installation, the discharge louvers must be adjusted so 
that the air does not blow directly onto the ice surface. 
 

INSPECTION 

The 

Thermoplus air

 dehumidifier must be inspected 

for damage immediately upon delivery. Any damage 
must be reported immediately to the carrier. The bill of 
lading must be marked "Received Damaged" and a 
claim filed with the Carrier. After reception, missing 
parts or damage to the unit must also be reported and 
a claim must be filed with the Carrier. 
 
Ensure  that  the  electrical  specifications  on  the 
nameplate

 correspond to the power supply voltage 

requested  on  the  purchase  order

  and  with  the 

power supply available on site. 
 

INSTALLATION 

These units must be installed on a service platform 15 
to 25 feet (4.6 to 7.6 m) above the ice surface. Since 
these  machines  operate  on  the  cooling  and  reheat 
principle, the discharge air could cause the ice to melt 
if it is too close to the ice surface. If the unit is to be 
installed  less  than  15  feet  (4.6  m)  from  the  ice 
surface, then the horizontal duct louvers (by others) 
must be adjusted to direct the airflow away from the 
ice surface. 
It is mandatory that this unit have a 36 inch (0.9 m) 
discharge duct, complete with horizontal and vertical

 

adjustable  louvers  or  at  least  with  horizontal 
adjustable  louvers (supplied by others). See Fig. 2. 
The discharge duct and louvers must not have a static 
pressure  drop  greater  than  0.2  inch  (5  mm). 
Excessive pressure drop will reduce unit capacity and 
cause system unbalance. 

 
Check blower rotation. On three phase units, if it is 
necessary to reverse the rotation, interchange any two 
supply leads. 
 
The  unit  must  be  level  for  proper  condensate 
drainage. A 

"P"

 trap must be installed on the drain 

pan  outlet.  Drain  connection  is  1-1/4"  MPT.  On 
installations  where  the  unit  is  to  operate  at 
temperature below freezing, a drain line 

heater must 

be  wrapped  around  the  condensate  drain  to 
prevent freeze up.  

The drain pan itself is heated to 

prevent condensate freeze-up inside the unit. 

 
Removal  of  the  drain  pan  for  cleaning  requires 
access from side opposite to drain to disconnect 
the drain pan heater line. 
 
ELECTRICAL CONNECTION

 

Site power supply must correspond

 with the 

unit 

serial plate data

. All connections must be made in 

accordance with local and national codes. Power line 
supply  must  be  of  suitable  size  and  adequately 
protected.

 

Power disconnect must be  installed next  to the 
unit.

 

 

MAINTENANCE 

Units must be inspected at least twice per season. 
 

CHECK LIST 

1) Belt tension - 

Check deflection at mid point between pulleys. 

2) Coils - 

Clean and free of dust or grease. 

3) Oil on fittings - 

Possible leak, contact refrigeration mechanic. 

4) Drain pans - 

To be free of obstructions (dirt, etc.). 

5) Electrical connections - 

All contacts must be tight to avoid overheating. 

 

Summary of Contents for IRD R404A Series

Page 1: ...om the ice surface then the horizontal duct louvers by others must be adjusted to direct the airflow away from the ice surface It is mandatory that this unit have a 36 inch 0 9 m discharge duct comple...

Page 2: ...refrigerant charge 3 Defective hot gas valve 4 Defective de ice control Refer to piping diagram for gas flow Fig 5 The installation of one or even two IRD Series units may not be sufficient to elimin...

Page 3: ...its can use the same switch Step 5 Discharge Duct Extension Provide a 36 inch 0 9 m discharge duct extension complete with horizontally and vertically adjustable louvers IMPORTANT Before starting up t...

Page 4: ...y during the active period or whenever high humidity is a problem When the return air temperature is low the IRD Series actually freezes moisture out of the air The coils have been designed for frost...

Page 5: ...ation at air inlet Follow duct design standards Unit undersized Recheck load calculations High head pressure Do not operate unit above 80 F 27 C Low airflow adjust blower belts Restricted filter dryer...

Page 6: ...Direct the airflow along the boards do not direct air over the ice surface 2 Discharge duct equipped with horizontally and vertically adjustable louvers supplied by others 3 Minimum horizontal distanc...

Page 7: ...ICE RINK DEFOGGER ELECTRICAL DIAGRAM Fig 4...

Page 8: ...MAN IRD 012 05 E 8 PIPING DIAGRAM Fig 5...

Page 9: ...ns checked for tightness Air flow and blower speed adjusted Units level and vibration isolated Drain connection tested and P trap filled Air entering temperature ____ F Minimum 4 feet Clearance on ret...

Reviews: