pg. XXII
5.9 INFORMA
5.9 INFORMA
5.9 INFORMA
5.9 INFORMA
5.9 INFORMATION
TION
TION
TION
TION ABOUT HO
ABOUT HO
ABOUT HO
ABOUT HO
ABOUT HOW
W
W
W
W THE GENERA
THE GENERA
THE GENERA
THE GENERA
THE GENERAT
T
T
T
TOR
OR
OR
OR
OR W
W
W
W
WORKS
ORKS
ORKS
ORKS
ORKS
5.9.1 DESCRIPTION OF
5.9.1 DESCRIPTION OF
5.9.1 DESCRIPTION OF
5.9.1 DESCRIPTION OF
5.9.1 DESCRIPTION OF THE OPERA
THE OPERA
THE OPERA
THE OPERA
THE OPERATING FUNCTIONS
TING FUNCTIONS
TING FUNCTIONS
TING FUNCTIONS
TING FUNCTIONS
WORK
60
65
45
55
17 : 15
PUF
Te
mp
er
at
ur
a
ac
qu
a
ge
ne
ra
to
re
(°c
)
Lavoro
Avvio
Off
tempo (minuti)
CAUTION: it is advisable to set the action temperature for sensors S1 and S2 as indicated in the hydraulic drawing in
para. 4.8.
CAUTION: when THERMOCONTROL ON is set on the heater / boiler, it starts up and shuts off autonomously only
depending on the S1 and S2 temperatures that are detected and set in the Thermocell. In this case manual
or programmed start ups and shut offs or those triggered by an external room temperature thermostat or
by an external chronothermostat are completely ignored .
The main operating phases are the following:
START
----> identifies the start up phase
WORK
----> identifies the operating phase
OFF
----> identifies the shut down phase
STOP
----> identifies the phase in which the boiler / heater exceeds a temperature of 80°C.
WAIT ON
----> identifies the phase preceding start up when the temperature in the boiler is over 63°C.
SUN OUT
----> identifies the excess heat dissipation phase (function only present when Thermocontrol is set on ON;
see para. 5.8).
START----> : has a duration of approx. 20 minutes, during this time the generator is programmed to light the flame. For this reason the
generator will not accept power variations in the firebox. The possibility of the generator not executing the lighting correctly can be attributed
to the following factors: cleanliness of the generator, smoke exhaust particularly cold, sudden surges and drops in the electric power supply,
fuel is moist or does not comply with the specifications (see para. 3.2) .
WORK : the duration depends on the ability of the system to receive heat. The generator's operating status is displayed.
OFF : has a duration of approx. 20 minutes, in this phase the generator is switched off until a new "on" phase is initiated. The aim is to make
the pellet embers in the burner die out completely. The temperature of the generator will drop until the system is completely cooled down.
STOP : If the temperature of the generator exceeds the 80°C threshold, the moment ary shut off, identified as STOP, is activated. In this
situation the generator is reactivated by means of a new START phase, as soon as the temperature drops below 58°C.
The STOP phase indicates that in the following time the generator will execute a new START phase: the generator shut down is only
temporary.
WAIT ON : In the event of a hot restart (where the boiler temperature is above 63°C) the heater / boiler does not st art up immediately but the
message WAIT ON appears on the display. When the boiler temperature reaches 58°C the lighting phase will begin, the message W AIT ON
disappears and the word START appears.
K E Y
generator water temperature (°C)
Start
Running
Off
Time (minutes)
When THERMOCONTROL ON is selected the
word PUF and the detected S1 and S2
temperatures are displayed during the
operating phases; see the image.
LEGENDA
Temperatura acqua generatore (°C)
Avvio
Lavoro
Off
Tempo (minuti)