13
Do not switch your underfloor heating on
unless the entire heating cable, cold tail
joint and end termination are fully encased
in tile adhesive.
It is important that all adhesives and
grouting are dry and fully cured before you
switch on your underfloor heating.
Most adhesives take between 7 to 10 days to cure. Follow
manufacturer guidelines.
The temperature of your underfloor heating should be
increased gradually to avoid thermal shock in the floor. Start at
15°C and work up to your desired temperature 2-3°C per day.
Observe any maximum temperature guidelines from your floor
manufacturer.
Wait for
7 - 10 Days
before you
switch on
!
Switching on for the first time