Page 7
RENEWABLE HEATING & COOLING TECHNOLOGY
INSTALLATION
Installation guidelines
The following information is for guidance only.
Locating the Unit
The unit should be located on a solid, flat, horizontal surface. Ensure 3 metres of free air
flow to the discharge panel and 1metre to the inlet panel. Ensure adequate access to the
controller and for maintenance purposes.
Precautions
--Avoid locating the unit close to bedrooms or other noise sensitive areas.
--Avoid a location which could create vibration i.e. secured to a solid wall.
--Try to avoid placing the unit under a tree or exposed to extreme conditions.
Water connection
The heat pump is connected to a filtration circuit with a by-pass.
It is imperative that the by-pass is placed after the pump and the filter.
The by-pass generally consists of 3 valves.
This makes it possible to regulate the water flow which passes through the heat pump
and to isolate the heat pump completely for any maintenance work, without cutting the
flow of filtered water.
If your installation is equipped with a water treatment system (chlorine, bromine, saltetc)
the by-pass must be installed before the water treatment, with a non-return valve
between the by-pass and water treatment system.
Summary of Contents for LCSPI-120
Page 6: ...RENEWABLE HEATING COOLING TECHNOLOGY OVERVIEW OF THE UNIT Page 5 LCSPI 120 150 170...
Page 7: ...Page 6 RENEWABLE HEATING COOLING TECHNOLOGY EXPLODED VIEW...
Page 19: ...Page 18 RENEWABLE HEATING COOLING TECHNOLOGY Model LCSPI 210 250 300...
Page 20: ...Page 19 RENEWABLE HEATING COOLING TECHNOLOGY TECHNICAL SPECIFICATIONS...