Depending on the weight of model of the equipment and 
battery module, it is recommended to make the installa-
tion works by two persons. 

 

ˆ

Fix the equipment to the frame of the cabinet by means 
of the screws "B".

Ŗ

Regarding the connections of the UPS with the battery 
module, make the following steps, but reading section 4.3.3 
previously:

 

ˆ

Connect the supplied earth joint cable "F", between the 
UPS and battery module.

 

ˆ

Remove the beautiful front cover of the equipment and 
battery module, as it is described in section 4.2.4.1.

 

ˆ

Take the extensible cable with connector "H" of the bat-
tery module and connect it with the "G" connector of the 
equipment.

To connect it with other battery modules, there is the "J" 
connector. Take the extensible cable with "H" connector 
of the beside battery module and connect it to the "J" con-
nector of the previous one. Repeat the same steps for a 
high quantity of modules.

 

ˆ

In the side of each front cover, there are the "K" trims as a 
notch to go the cables through it with the battery modules. 
Break the needed trims to pass the connection bus.

 

ˆ

Put the beautiful front cover back of the equipment and 
battery module, as it is stated in section  4.2.4.1.

4.3. Connection.

Ŗ

Cross cable section used in the power supply of the 
equipment and loads to feed, will be sized according 

to the nominal current stated in the nameplate sticked on the 
equipment, by respecting the Low Voltage Electrotechnical 
Regulations or norms of the corresponding country.

Ŗ

Installation will have the suitable input protections sized to 
the current of the equipment and stated in the nameplate of 
the equipment (residual current devices type B and circuit 
breaker with C characteristic or any other equivalent one).

Overload conditions are considered as a nonpermanent an 
exceptional operating mode, so these currents will not be 
kept in mind when sizing the protections.

Ŗ

Output protection will be done with a circuit breaker of C char-
acteristic or any other equivalent one.

 The equipments can be installed and used by per-
sonnel with not specific training, just with only help of 

this «Manual».

Ŗ

To insert  the option cards, it is needed to remove the fixing 
screws of the smart slot and the own cover.

When finalising the corresponding tasks, the cover will be in-
stalled and its fixing screws again.

4.3.1.  Connection of input.

Ŗ

 As this is a device with class I protection against elec-

tric shocks, it is essential to install a protective earth 

conductor (connect earth(

)). Connect the conductor be-

fore connecting the power supply to the input power block.

Ŗ

Take the power cord with schuko plug and IEC connector and 
connect the IEC connector to the UPS inlet. Next insert the 
schuko plug to the AC mains outlet.

4.3.2.  Connection of the IEC outlets.

Ŗ

 As this is a device with class I protection against elec-

tric shocks, it is essential to install a protective earth 

conductor (connect earth(

)). Connect the conductor to 

the terminal, before connecting the power supply to the input 
power block.

Ŗ

All the equipments have female IEC outlets, in greater or lesser 
numbers depending on the power rate of the equipment:

 

ˆ

Models up to 1 kVA: 1 group of 4 IEC outlets of 10A.

 

ˆ

Models of 1,5 and 2 kVA: 2 groups of 4 IEC outlets of 10A la-
belled as LS1 and LS2, which can be set through the control 
panel and/or Win Power.

 

ˆ

Models of 3 kVA: 2 groups of 4 IEC outlets of 10A labelled 
as LS1 and LS2, which can be set through the control panel 
and/or Win Power, plus a IEC connector of 16A.

 

ˆ

 Loads can be connected to the IEC outlets, mean-
while the features of the equipment and IEC out-

lets limitations are not exceeded, otherwise there will be 
sudden blackouts in the power supply of the connected 
loads at the output.

Ŗ

If besides of the critical loads, it is required to connect lag-
ging loads of high consumption, like laser printers or CRT 
monitors,  the inrush currents of these peripherals will be kept 
in mind in order to avoid blocking the equipment under the 
worst conditions.

It is better to not connect the loads of this kind, due to the high 
quantity of energy resources that take from the UPS.

4.3.3.  Connection of the external 

batteries (extended back up time).

Ŗ

As this is a device with class I protection against elec-

tric shocks, it is essential to install a protective earth 

conductor (connect earth(

)). Connect the conductor to 

the terminal, before connecting the power supply to the input 
power block.

Ŗ

 To not respect the stated indications in this sec-
tion and the safety instructions 1.2.3 means a 

high risk of electrical discharge and even the death.

Ŗ

To connect the batteries with the equipment, follow the de-
scribed steps in sections 4.2.4.4 and 4.2.4.6.

Ŗ

All the standard UPSs have batteries in the same enclosure, 
less the B0 and B1 (not available for models equal or below 
1kVA). Battery protection is done by internal fuses and not ac-
cessible for the end-user.

Battery modules have internal protections for the batteries 
too and they are not accessible for the end-user.

Ŗ

 IMPORTANT FOR SAFETY: In case of installing the 
batteries by yourself, the accumulators has to be pro-

vided with a two pole circuit breaker protection sized to the 
features stated in table 3.

Ŗ

Before starting the connection between the bat-
tery module/s and the equipment, check that the 

equipment and loads are in "Off" position.

Likewise when batteries are installed by the own user, 
the fuse or switch has to be turned off.

Ŗ

Connection terminals of external batteries with the equip-
ment are done with a polarised Anderson connector. This 
connector is not available in models up to 1kVA.

Ŗ

For battery connection with the equipment, follow the stated 
steps in sections 4.2.4.4 and 4.2.4.6, keeping in mind the model.

Thiele KG • V

orderer W

einberg 26 • D-71522 Backnang • T

el.:(07191)3560-0 • Fax.:(07191)3560-19 • info@thiele-electroni

c.de • www

.thiele-electronic.de

Thiele KG • V

orderer W

einberg 26 • D-71522 Backnang • T

el.:(07191)3560-0 • Fax.:(07191)3560-19 • info@thiele-electroni

c.de • www

.thiele-electronic.de

Vorderer Weinberg 26

 • D-71522 Backnang • 

Tel.:+49 (0)7191 3560-0 (Fax.:-19)

Summary of Contents for SPS.1000.ADV RT

Page 1: ...VANCE RT series UNINTERRUPTIBLE POWER SUPPLY USER S MANUAL Thiele KG Vorderer Weinberg 26 D 71522 Backnang Tel 07191 3560 0 Fax 07191 3560 19 info thiele electronic de www thiele electronic de Thiele...

Page 2: ...x 07191 3560 19 info thiele electronic de www thiele electronic de Thiele KG Vorderer Weinberg 26 D 71522 Backnang Tel 07191 3560 0 Fax 07191 3560 19 info thiele electronic de www thiele electronic de...

Page 3: ...minals in UPSs 1kVA Emergency Power Off 4 3 6 Communication port 4 3 6 1 RS232 and USB interface 4 3 6 2 Smart slot 4 3 6 3 AS400 Interface with DB9 output option 4 3 6 4 Protection against transient...

Page 4: ...ntents the basic in structions and features for the equipment safety To not respect these indications can create material damages on the own equip ment installation or loads Notes of information symbo...

Page 5: ...ne of them It is essential that the cables that supplies the loads have the earth connection cable The protection earth must be connected to the frame or metallic chassis of any electrical equipment i...

Page 6: ...l conditions and avoid the possible condensations The UPS has to be completely dry before starting any instal lation task Do not store install or expose the equipment in corrosive wets dusty inflammab...

Page 7: ...ubber gloves and shoes Use tools with insulated handles Take off watches rings or other metal objects Do not place metal tools or objects over the batteries Never manipulate with your hands or through...

Page 8: ...safety requirements for UPS s used in ac cessible areas by end users EN IEC 60950 1 IT equipments Safety Part 1 General re quirements EN IEC 62040 2 Uninterruptible power supply UPS Part 2 EMC requir...

Page 9: ...with LCD Plastic beauty front Front view battery module for ADVANCE RT Fig 1 Front view models from 0 7 to 10 kVA and battery modules for extended back up times 3 1 2 Legend corresponding to the equip...

Page 10: ...ets LS2 Input connector for modem ADSL Fax line RS232 COM port Standard 3000 VA and B1 model IEC outlets LS1 USB COM port IEC inlet for AC power supply Earth connection for battery module Output conne...

Page 11: ...ule i Note relative to the batteries B0 and B1 acronyms stated the nomenclature related to batteries B0 The equipment is supplied without batteries and without accessories for them screws and electric...

Page 12: ...han 1000 VA it is possible to increase the standard back up time of the equipments by connecting additional modules and or to optimise the recharging time of the accumula tors by fitting chargers with...

Page 13: ...The available SNMP option for SPS ADVANCE RT series is a card to be inserted into the slot that the UPS has in its rear side The connection of the UPS with the SNMP is internal meanwhile the connecti...

Page 14: ...act has to be fitted in residual current device at the output of each transformer because due to its specification of isolation it will prevent the triggering of the protections fitted in the primary...

Page 15: ...s Cut the strips of cardboard enclosure Remove the accessories cables supports Remove the equipment or battery module from the pack aging keeping in mind that the it is needed the help of a second per...

Page 16: ...se way as its removing see section 4 2 4 1 4 2 4 3 Vertical assembling tower type Rotate the control panel according to section 4 2 4 2 Take the 4 plastic pieces A with angle shape supplied with the e...

Page 17: ...eak the needed trims to pass the connection bus Put the beautiful front cover back of the equipment and battery module as it is stated in section 4 2 4 1 4 2 4 5 19 rack cabinet assembling All models...

Page 18: ...of them is 2 units Proceed as follows Fix both adaptor angles A to the equipment and to the battery module as rack on their side by means of the supplied screws C B F G J K K H Fig 9 Model in rack mou...

Page 19: ...to the terminal before connecting the power supply to the input power block All the equipments have female IEC outlets in greater or lesser numbers depending on the power rate of the equipment Models...

Page 20: ...y of the two cables that goes from the button to the UPS were cut damaged On the other hand this failure would be immediately detected in the normally open EPO type with the inconvenience of the sudde...

Page 21: ...nPower is a UPS monitoring software which makes a user friendly interface of monitoring and management This software supplies an auto Shutdown for a system based on several PCs in case of an electrica...

Page 22: ...d that the equipment becomes blocked under the worst conditions It is better to not connect the loads of this kind due to the high quantity of energy resources that take from the UPS USER MANUAL Thiel...

Page 23: ...S start up with mains present For the daily start up of the equipment press over the start up key for more than 3 seconds the acoustic alarm will beep for 1 sec and the UPS will start up Fan will be s...

Page 24: ...Blue OPVH Fault Battery mode with output voltage too high Red OPVL Fault Output voltage is too low Red OPST Fault Short circuit at the output Red OVLD Warning Overload Red BATH Warning Battery voltage...

Page 25: ...e 001 Wide range 002 Gen set EBM External battery module 0 9 it is the quantity of battery modules TEST Auto test 000 Deactive 001 Active AR Automatic restart 000 Deactive 001 Active GF Green mode 000...

Page 26: ...e second to enter into the element to set 4 Select the configuration value Press the key to select the quantity of battery mod ules available for the UPS 5 Confirm the configuration Press the key for...

Page 27: ...he batteries so there are hazardous voltages in side Therefore before doing any reparation or maintenance task the internal battery fuses and or the interlink connections be tween them and the UPS hav...

Page 28: ...dequate testing tentative of repairing or not authorized modification or any other cause beyond the foreseen use or by accident fire lightnings or other dangers Neither it will cover in any case compe...

Page 29: ...al or total way with the purpose to be adapted to the customer s need Consult our Website to have more information 7 5 Technical service network Coverage both national and international from our Servi...

Page 30: ...Voltage accuracy battery mode 5 Voltage THD linear load 10 3 Voltage THD non linear load 12 6 Frequency With mains present synchronised to nominal of the input 45 55 55 65 Hz Free running battery mode...

Page 31: ...example the one supplied by the battery it is con tinuous any current that always maintain the polarity DSP It is the acronym of Digital Signal Processor A DSP is a system based on a processor or mic...

Page 32: ...irect cur rent This is done by rectifier diodes which can be solid state semiconductors vacuum or gassy valves as the mercury vapour Depending on the features of the alternating current power supply u...

Reviews: