DFT-6300 Battery Load Bank Instruction Manual
18
3.4 PC connection
If real-time monitoring via a PC is required, Wi-fi of Tester and PC needs to be connected.
3.5
Running
After checking that all wiring are correct, turn on the power switch, and after the LCD screen should be displayed
normally, you can complete the setting of various test/discharge parameters according to the operating
instructions.