DFT-6300 Battery Load Bank Instruction Manual
7
simple and straightforward.
Automatic protection function, set the discharge time to, discharge capacity to; The battery string voltage
is lower than the set minimum protection voltage; If there is an abnormality in the load connection, etc., the
discharge is automatically stopped and alarmed, and the shutdown mode is automatically recorded.
Test/discharge termination conditions can be set, including cell battery voltage, battery string termination
voltage, discharge current, and discharge time.
Tester can record the discharge of each battery during the test/discharge process, mainly the total capacity of
the battery string , the total voltage, the total current and the voltage change of the single-cell battery with
the lowest voltage.